Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01173
StatusFinaled
Name GENTHER MASONRY INC
Site Address 5120 W OVERLAND RD
Project NameHILLCREST SHOPPING CENTER
Customer Number 
ePlanReviewNo
Description
(HILLCREST SHOPPING CENTER - EXTERIOR FACADE REMODEL) This building is fire sprinklered for unlimited area. To remodel about 1,100 lineal feet of the exterior facade of the Hillcrest Shopping Center. Work is to include non-fire-resistance-rated parapet structures, steel stud framing, structural wood sheathing, gypsum sheathing, EIFS, veneer brick, some new steel roof joists, and structural modifications to existing steel roof joists. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. DRH06-00095 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/6/20086/6/20086/6/2008 PASS
DetailsTom Arcoraci
DOC - Permit Finaled6/6/20086/6/20086/6/2008PPASS
DetailsTom Arcoraci
BLD-Final3/26/20083/26/20083/26/2008PPASS
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Todd Kurns
Code Occupancy Approval3/13/20083/13/20083/13/2008PPASS
DetailsDena Gambrel
3-13-08 1113 Passed.
BLD-Aging Inspection1/15/20081/15/20081/15/2008 FAIL
DetailsDena Gambrel
1-14-07 Spoke to Todd. He has still not installed the handicap parking and above ground handicap signs. D. Gambrel
Code Occupancy Approval11/15/200711/15/200711/15/2007PFAIL
DetailsDena Gambrel
11-14-07 Need more handicap spaces and above ground signs per what the stamped plans indicated.
BLD-Aging Inspection11/14/200711/14/200711/14/2007 CANC
DetailsTom Arcoraci
FIRE-Final Inspection9/13/20079/14/20079/14/2007APASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection9/12/20079/13/20079/13/2007ACANC
DetailsTroy Cobbley
Troy,

I think I have the correct documentation for you to do your inspection. Call me and let me know when you will be at Hillcrest.

Thanks,

Todd Phone #: ###-#### Internet Inspection Request from: Todd Kurns Inspection cancelled from web by: Todd Kurns
FIRE-Final Inspection8/24/20078/27/20078/27/2007AFAIL
DetailsTroy Cobbley
The city approved plans on site were the resubmittals and they were missing the fire dept plan review comments. They were not available on line either. No inspection performed.
BLD-Aging Inspection8/23/20078/23/20078/23/2007 CANC
DetailsTom Arcoraci
DOC - Permit Expired8/23/20078/23/20078/23/2007PPASS
DetailsTom Arcoraci
BLD-Aging Inspection5/15/20075/15/20075/15/2007 NR
DetailsTom Arcoraci
BLD-Final2/5/20072/5/20072/5/2007PNR
DetailsTom Arcoraci
Tom, Can you please call me and let me know where I can meet you to pick up the final certificates. Thanks, Todd Phone #: ###-#### needs zoning and fire
FIRE-Final Inspection12/11/200612/12/200612/11/2006ACANC
DetailsTroy Cobbley
Phone #: ###-#### Internet Inspection Request from: Todd Kurns Inspection cancelled from web by: Todd Kurns
BLD-Framing/Rough-in10/17/200610/19/200610/19/2006APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Todd Kurns work in progress
BLD-Framing/Rough-in10/10/200610/10/200610/10/2006PPART
DetailsTom Arcoraci
Tom, this is another partial for framing so the sheating can continue to be installed. Thanks, Todd; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
BLD-Framing/Rough-in9/18/20069/18/20069/18/2006PPART
DetailsTom Arcoraci
Tom, I need you to look at another portion of the framing in order for us to sheath it. Thanks, Todd; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
BLD-Framing/Rough-in8/24/20068/25/20068/25/2006APART
DetailsTom Arcoraci
Inspector, Can you please call me on your way over there so that I can meet you at the job site. Thanks, Todd; Phone #: ###-#### Internet Inspection Request wip east ok from: Todd Kurns wip east side ok