BLD-Final | 4/21/2008 | 4/21/2008 | 4/21/2008 | P | PASS |
Dave Hannah
|
|
|
joe Phone #: ###-#### ok for perm occ
|
BLD-Final | 5/9/2007 | 5/10/2007 | 5/10/2007 | A | PART |
Dave Hannah
|
|
|
joe ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok for temp occ
|
BLD-Final | 5/4/2007 | 5/8/2007 | 5/9/2007 | P | FAIL |
Dave Hannah
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs other trades finaled
|
FIRE-Final Inspection | 5/4/2007 | 5/8/2007 | 5/8/2007 | A | PASS |
Forrest France
|
|
|
Corrections are complete, fire life safety inspection passed.
|
BLD-Framing/Rough-in | 10/6/2006 | 10/9/2006 | 10/9/2006 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover walls after gas piping test
|
BLD-Conference | 9/25/2006 | 9/25/2006 | 9/27/2006 | P | PEND |
Dixie Fellows
|
|
|
per dixie..spoke with owner (johnny) and suggested he go back to his engineer ? and have him revise the mechanical drawings on the type 1 hoods and grease ducts, terminations, make-up air, clearances, etc to comply with the imc section on commercial kitchen equipment. then once that is done and he has hired a licensed mechanical contractor they will schedule a conference and we will all meet, review the plans and discuss the job..i also told him the hoods he had purchased for this job couldn't be installed as they have no listings per the imc.
|