BLD-Final | 1/9/2007 | 1/10/2007 | 1/10/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/9/2007 at 12:37:05 PM. Contact: ###-####. ok for perm occ
|
Permanent Occupancy | | 1/10/2007 | 1/10/2007 | | DONE |
|
|
|
|
BLD-Final | 8/31/2006 | 9/1/2006 | 9/1/2006 | A | PART |
Dave Hannah
|
|
|
andy - call prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for temp occ needs to remove bolt on door
|
FIRE-Final Inspection | 8/31/2006 | 8/31/2006 | 8/31/2006 | P | PASS |
Forrest France
|
|
|
Items on previous c/n have been verified for completion, inspeciton passed.
|
FIRE-Final Inspection | 8/30/2006 | 8/30/2006 | 8/30/2006 | P | FAIL |
Forrest France
|
|
|
Need to post max. occupant load sign per review comments, repair door leaf at the north entry/exit doors, install missing ceiling tile and sprinkler escutcheon at the dry storage room, provide one additional PFE for the back office and storage area as discussed.
|
BLD-Framing/Rough-in | 8/22/2006 | 8/22/2006 | 8/22/2006 | P | PASS |
Dave Hannah
|
|
|
andy - ceiling; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to cover ceiling
|
BLD-Framing/Rough-in | 8/15/2006 | 8/16/2006 | 8/16/2006 | A | PART |
Dave Hannah
|
|
|
andy - call prior for access (ceiling grid insp); Phone #: ###-#### Internet Inspection Request from: Barbara Buckley grid ok but need to fix holes in ceiling
|