Permit Information
Permit NumberBLD06-01463
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 10790 W FRANKLIN RD
Project NameIDAHO POWER
Customer Number 
ePlanReviewNo
Description
(RCE-764) (IDAHO POWER - ELEVATOR ADDITION) This building is NOT fire sprinklered. To construct an interior elevator to serve the 2nd story of an existing building. The 2nd story will be expanded by about 75 square feet. Work is to include concrete footings, a concrete foundation, a masonry shaft for the elevator, a steel column, steel beams, a concrete floor, interior nonbearing walls, tunneled 1-hr corridor, relocated corridor doors, and an elevator machine room. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/3/20078/6/20078/6/2007APASS
DetailsMike Jordan
mark Phone #: ###-####. Final ok.
FIRE-Final Inspection8/3/20078/3/20078/6/2007PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection7/23/20077/23/20077/23/2007PFAIL
DetailsTroy Cobbley
The exit signs still do not operate on battery backup.
FIRE-Final Inspection7/16/20077/17/20077/17/2007AFAIL
DetailsTroy Cobbley
Repair the existing exit signs and emergency lights
BLD-Final7/13/20077/16/20077/16/2007ANR
DetailsMike Jordan
MARK Phone #: ###-####. Needs life/safety and mech final.
BLD-Wall cover11/28/200611/28/200611/28/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/28/2006 at 9:28:03 AM. Contact: ###-####. Inspected completion of 1hr wall and ceiling assemblies at corridor on 1st and 2nd floors. Reviewed UL data for fire caulking sysytem being used. Fire caulking in progress, will inspect remainder on final.
BLD-Conference11/21/200611/21/200611/21/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/21/2006 at 7:57:25 AM. Contact: ###-####. received and reviewed wp file for rated const. Ok to one side 1hr ceiling assembly down stairs. Inspected 5/8 type x at 2nd floor corridor walls and cewiling assembly.
BLD-Framing/Rough-in11/20/200611/20/200611/20/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/20/2006 at 9:19:53 AM. Contact: ###-####. 1hr ceiling assembly in corridors. ok to one side. Needs to provide WP for one hour assembly and UL listings for penetrations.
BLD-Other9/22/20069/25/20069/25/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/22/2006 at 3:02:59 PM. Contact: ###-####. Elevator shaft (masonry) 0 to 8ft elev. Will require cleanouts. Also will have special insp.
BLD-Framing/Rough-in9/21/20069/22/20069/22/2006PCANC
DetailsMike Jordan
mark Note: rebar; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. cnc by contractor.
BLD-Conference9/18/20069/18/20069/18/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/18/2006 at 8:21:46 AM. Contact: ###-####.
BLD-Foundation9/8/20069/8/20069/8/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/8/2006 at 8:24:40 AM. Contact: ###-####.wip at elvator pit walls.
BLD-Footing9/6/20069/7/20069/7/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/6/2006 at 4:29:42 PM. Contact: ###-####. elevator pit footing.