BLD-Final | 8/3/2007 | 8/6/2007 | 8/6/2007 | A | PASS |
Mike Jordan
|
|
|
mark Phone #: ###-####. Final ok.
|
FIRE-Final Inspection | 8/3/2007 | 8/3/2007 | 8/6/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 7/23/2007 | 7/23/2007 | 7/23/2007 | P | FAIL |
Troy Cobbley
|
|
|
The exit signs still do not operate on battery backup.
|
FIRE-Final Inspection | 7/16/2007 | 7/17/2007 | 7/17/2007 | A | FAIL |
Troy Cobbley
|
|
|
Repair the existing exit signs and emergency lights
|
BLD-Final | 7/13/2007 | 7/16/2007 | 7/16/2007 | A | NR |
Mike Jordan
|
|
|
MARK Phone #: ###-####. Needs life/safety and mech final.
|
BLD-Wall cover | 11/28/2006 | 11/28/2006 | 11/28/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/28/2006 at 9:28:03 AM. Contact: ###-####. Inspected completion of 1hr wall and ceiling assemblies at corridor on 1st and 2nd floors. Reviewed UL data for fire caulking sysytem being used. Fire caulking in progress, will inspect remainder on final.
|
BLD-Conference | 11/21/2006 | 11/21/2006 | 11/21/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/21/2006 at 7:57:25 AM. Contact: ###-####. received and reviewed wp file for rated const. Ok to one side 1hr ceiling assembly down stairs. Inspected 5/8 type x at 2nd floor corridor walls and cewiling assembly.
|
BLD-Framing/Rough-in | 11/20/2006 | 11/20/2006 | 11/20/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/20/2006 at 9:19:53 AM. Contact: ###-####. 1hr ceiling assembly in corridors. ok to one side. Needs to provide WP for one hour assembly and UL listings for penetrations.
|
BLD-Other | 9/22/2006 | 9/25/2006 | 9/25/2006 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/22/2006 at 3:02:59 PM. Contact: ###-####. Elevator shaft (masonry) 0 to 8ft elev. Will require cleanouts. Also will have special insp.
|
BLD-Framing/Rough-in | 9/21/2006 | 9/22/2006 | 9/22/2006 | P | CANC |
Mike Jordan
|
|
|
mark Note: rebar; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. cnc by contractor.
|
BLD-Conference | 9/18/2006 | 9/18/2006 | 9/18/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/18/2006 at 8:21:46 AM. Contact: ###-####.
|
BLD-Foundation | 9/8/2006 | 9/8/2006 | 9/8/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/8/2006 at 8:24:40 AM. Contact: ###-####.wip at elvator pit walls.
|
BLD-Footing | 9/6/2006 | 9/7/2006 | 9/7/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/6/2006 at 4:29:42 PM. Contact: ###-####. elevator pit footing.
|