Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-01589
StatusFinaled
Name IDAHO TRUST NATIONAL BANK
Site Address 896 W BROAD ST
Project NameBODO BLDG #4
Customer Number 
ePlanReviewNo
Description
(RCE-764) (IDAHO TRUST NATIONAL BANK - BODO BLDG #4 - 1ST AND 2ND STORIES) This building is fire sprinklered for area increase. To create a 10,108 square foot bank tenant space on the 1st and 2nd stories of BoDo Building #4. The 1st story will have a floor area of 3,591 square feet at grade and 590 square feet on a mezzanine. The 1st story will include a bank lobby, teller station, offices, file room, and secured cash room. The mezzanine will include a gallery for the display of art. The 2nd story will have a floor area of 5,927 square feet. The 2nd story will include a board room, conference rooms, offices, file room, and restrooms. Work on the 1st story includes an elevator pit, a glass elevator shaft, an elevator accessible to the disabled, interior nonbearing walls, interior doors, interior windows, interior bearing walls, shear walls, concrete footings, steel beams and columns, concrete mezzanine floor, and finishes. Work on the 2nd story includes 2 restrooms accessible to the disabled, interior nonbearing walls, an elevator shaft, interior doors, interior windows, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/2/20071/3/20071/3/2007APASS
DetailsDave Hannah
Jan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok for perm occ
FIRE-Final Inspection9/28/200610/2/200610/2/2006APASS
DetailsForrest France
Fire life safety passed final inspection.
BLD-Final9/22/20069/25/20069/26/2006PPART
DetailsDave Hannah
jan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for temp occ need to relock front door
FIRE-Final Inspection9/25/20069/25/20069/25/2006PPART
DetailsForrest France
Fire life safety is satisfactory pending final of project related alarm permit including completion of smoke and heat detectors at the top of the elevator hoistway. Temporary occupancy has been granted for the second floor portion of this tenant.
FIRE-Final Inspection9/22/20069/25/20069/25/2006AFAIL
DetailsForrest France
Project related fire alarm permit must be finaled prior to life safety final, need to relocate two and add one exit sign as discussed, need to install visual indicators at the main entry/exit door locks per review notes.
BLD-Final9/21/20069/22/20069/25/2006PNR
DetailsDave Hannah
jan ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley needs other trades finaled
FIRE-Final Inspection9/21/20069/22/20069/22/2006PNR
DetailsForrest France
Project related alarm permit must be finaled prior to BLD life safety final.
BLD-Framing/Rough-in9/14/20069/15/20069/15/2006APART
DetailsDave Hannah
jan -ceiling cover; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to cover ceiling
FIRE-Final Inspection8/18/20068/21/20068/21/2006APART
DetailsForrest France
c/n items related to the 2nd floor life safety have been completed. No inspections for the 1st floor have been done at this time regarding alarm, sprinkler, or life safety.
BLD-Final8/17/20068/18/20068/18/2006APART
DetailsDave Hannah
Jan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to occ second floor after fire oks
FIRE-Final Inspection8/17/20068/18/20068/18/2006AFAIL
DetailsForrest France
Provide addressing for the second floor, hardware at the boardroom must meet code requirements, 2nd floor only life safety inspection completed today.
BLD-Final8/16/20068/17/20068/17/2006PCANC
DetailsDave Hannah
jan - temp occupancy insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
FIRE-Final Inspection8/17/20068/17/20068/17/2006PNR
DetailsForrest France
Project is not ready for life safety inspection at this time, advised contractor of remaining issues.
BLD-Final8/14/20068/15/20068/15/2006PNR
DetailsDave Hannah
jan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Other8/15/20068/15/20068/15/2006PPART
DetailsDave Hannah
jan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ceiling grid ok drop in pannels after elec and fire r/is are completed
BLD-Concrete8/14/20068/15/20068/15/2006APART
DetailsDave Hannah
slab inspection; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt slab for mezz. ok to pour
BLD-Wall cover8/2/20068/3/20068/3/2006PPART
DetailsDave Hannah
jan Note: if possible right after lunch or before ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ground floor ext walls
BLD-Energy code compliance8/2/20068/3/20068/3/2006PPART
DetailsDave Hannah
jan Note: if possible right after lunch or before ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ground floor ext wall around columns ok to cover
BLD-Energy code compliance7/20/20067/21/20067/21/2006APART
DetailsDave Hannah
jan ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley needs to finish vapor barr
BLD-Energy code compliance7/19/20067/20/20067/20/2006AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/19/2006 at 3:49:22 PM. Contact: ###-####. needs a class a vis queen
BLD-Wall cover7/18/20067/19/20067/19/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/18/2006 at 3:09:00 PM. Contact: ###-####. ok to insulate ext walls on second floor ok to cover perimeter walls on second floor
BLD-Foundation7/17/20067/18/20067/18/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/17/2006 at 2:12:37 PM. Contact: ###-####.
BLD-Footing7/14/20067/17/20067/17/2006PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/14/2006 at 10:19:31 AM. Contact: ###-####. rebar not per plan