Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01600
StatusFinaled
Name GABRIELLI BUILDS INC
Site Address 5994 E MILLET DR
Project NameHillside
Customer Number 
ePlanReviewNo
Description
Bob Fink contractor registration number is RCE-1557. To construct a three bedroom, three and one quarter bathroom 3952 sq. ft. two story single family dwelling (2917 sq. ft. first floor/1035 sq. ft. second floor) with a attached 1282 sq. ft. three car garage, a 1162 sq. ft. covered back porch and a 148 sq. ft. covered front porch. Per approved plans, engineering and requirement list. CFH-6-22 per Angela Wood with Planning and Zoning. This lot is within a hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/29/20071/30/20071/30/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/29/2007 at 12:26:52 PM. Contact: ###-####.
DOC - Permit Finaled1/30/20071/30/20071/30/2007PPASS
DetailsDave Hannah
BLD-Final1/25/20071/26/20071/26/2007AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/25/2007 at 2:05:40 PM. Contact: ###-####. needs hand railing on stairs and tempered glass upstairs patio doors
BLD-Grading Inspection1/25/20071/25/20071/25/2007 DONE
Final grading and drainage approved
BLD-Wall cover10/13/200610/16/200610/16/2006APASS
DetailsDave Hannah
Bob; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt insulation ok ok to cover
BLD-Wall cover10/12/200610/13/200610/13/2006PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/12/2006 at 2:45:32 PM. Contact: ###-####. Inspection cancelled from web by: Cathy Weisshaupt
BLD-Framing/Rough-in10/10/200610/11/200610/11/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/10/2006 at 11:06:21 AM. Contact: ###-####. c/n on site ok to cover ext wall and ok to insulate
BLD-Footing7/17/20067/18/20067/18/2006APASS
DetailsDave Hannah
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Foundation7/11/20067/12/20067/12/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/11/2006 at 1:17:25 PM. Contact: ###-####. more ftgs and wall ok to pour
BLD-Footing6/30/20067/5/20067/5/2006APART
DetailsDave Hannah
bob; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley about 70 percent off footing ok to pour will form the rest and pour later