BLD-Final | 12/19/2007 | 12/20/2007 | 12/20/2007 | A | PASS |
Dave Hannah
|
|
|
rick - please call for access Phone #: ###-####
|
DOC - Permit Finaled | 12/20/2007 | 12/20/2007 | 12/20/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 12/17/2007 | 12/17/2007 | 12/17/2007 | P | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Final | 12/14/2007 | 12/14/2007 | 12/14/2007 | P | NR |
Dave Hannah
|
|
|
rick Phone #: ###-#### needs hillside final
|
BLD-Energy code compliance | 7/12/2007 | 7/12/2007 | 7/12/2007 | P | PASS |
Dave Hannah
|
|
|
###-#### Rick
|
BLD-Framing/Rough-in | 7/9/2007 | 7/9/2007 | 7/9/2007 | P | PART |
Mike Jordan
|
|
|
Phone #: ###-####. Needs paperwork from engineer noting notched beam is ok at stairway for headroom. Needs to complete lateral bracing. Add studs under girder east side of main enterance. Rowblock floor joist at cantilever section. Will check remainder of fireblocking on e nergy insp.
|
BLD-Framing/Rough-in | 7/6/2007 | 7/6/2007 | 7/6/2007 | P | NR |
Jim Sly
|
|
|
rick Phone #: ###-#### NR........C/N posted
|
BLD-Foundation | 4/23/2007 | 4/24/2007 | 4/24/2007 | A | PASS |
Dave Hannah
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Footing | 4/19/2007 | 4/20/2007 | 4/20/2007 | A | PASS |
Dave Hannah
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Foundation | 4/18/2007 | 4/19/2007 | 4/19/2007 | A | PART |
Dave Hannah
|
|
|
matt ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith rebar in forms at 85 %
|
BLD-Footing | 4/11/2007 | 4/11/2007 | 4/13/2007 | P | PART |
Dave Hannah
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Stacie Backus needs mti aproval crew poured with out terrys ok rebar per plan but crew was told not to pour untill I got ok from terry
|
BLD-Footing | 4/10/2007 | 4/11/2007 | 4/11/2007 | A | FAIL |
Dave Hannah
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Stacie Backus needs terrys sign off
|