BLD-Final | 12/28/2006 | 12/28/2006 | 12/28/2006 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 12/26/2006 | 12/28/2006 | 12/28/2006 | P | PART |
Jim Storey
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
|
FIRE-Final Inspection | 12/26/2006 | 12/27/2006 | 12/27/2006 | P | PASS |
Forrest France
|
|
|
Life safety inspection passed, noted door hardware at the teller gate at the front entry lobby is installed backward and will need to be repaired prior to structural final.
|
FIRE-Conference | 12/19/2006 | 12/20/2006 | 12/20/2006 | A | DONE |
Forrest France
|
|
|
Confrence to discuss building addressing.
|
BLD-Framing/Rough-in | 12/14/2006 | 12/14/2006 | 12/14/2006 | P | FAIL |
Jim Storey
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett wrong edge molding
|
BLD-Framing/Rough-in | 12/11/2006 | 12/11/2006 | 12/11/2006 | P | PART |
Mike Jordan
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Barbara Sti. ri insp not done above grid. Needs to repair several wires that are exceeding the 1:8 as noted on approved plans. Will repir wires and reinspect.
|
BLD-Energy code compliance | 11/20/2006 | 11/21/2006 | 11/21/2006 | P | PASS |
Jim Storey
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Energy code compliance | 11/9/2006 | 11/13/2006 | 11/13/2006 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles stil pending truss repair to verify at ceilling insp.
|
BLD-Framing/Rough-in | 11/7/2006 | 11/8/2006 | 11/8/2006 | P | PART |
Jim Storey
|
|
|
Rob; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt truss repair ok to insulate.
|
BLD-Framing/Rough-in | 11/1/2006 | 11/2/2006 | 11/2/2006 | A | PART |
Jim Storey
|
|
|
shear nailing; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt exterior nailling ok
|
BLD-Framing/Rough-in | 11/1/2006 | 11/1/2006 | 11/1/2006 | P | DEFR |
Jim Storey
|
|
|
shear nailing; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt out of time.
|
BLD-Energy code compliance | 9/25/2006 | 9/26/2006 | 9/26/2006 | A | PASS |
Jim Storey
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles vapor barrior ok under slab.
|
BLD-Footing | 8/31/2006 | 9/1/2006 | 9/1/2006 | A | PART |
Jim Storey
|
|
|
Rob, early a.m., please; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt wip pending si
|