BLD-Final | 5/2/2007 | 5/2/2007 | 5/2/2007 | P | PASS |
Mike Jordan
|
|
|
ron ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. ok for perm occ.
|
FIRE-Final Inspection | 5/1/2007 | 5/2/2007 | 5/2/2007 | A | PASS |
Troy Cobbley
|
|
|
LIfe safety passed.
|
Permanent Occupancy | | 5/2/2007 | 5/2/2007 | | DONE |
|
|
|
|
BLD-Final | 4/26/2007 | 4/27/2007 | 4/27/2007 | A | NR |
Mike Jordan
|
|
|
ron ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Life/safety failed.
|
Code Occupancy Approval | 4/25/2007 | 4/26/2007 | 4/26/2007 | A | PASS |
Scott M.Brown
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ALL IN OK FOR FINAL
|
FIRE-Final Inspection | 4/25/2007 | 4/26/2007 | 4/26/2007 | A | FAIL |
Troy Cobbley
|
|
|
Provide correct sticker at the main exit, either remove the duct smoke detectors since they are not required or install correctly and provide with remote annunciators, provide asbuilt drawings for the relocation of the fire hydrant to city of boise, provide exit discharge lighting and provide correct door hardware on the north office door (remove the manual flush bolt)
|
BLD-Other | 3/16/2007 | 3/16/2007 | 3/16/2007 | P | PASS |
Mike Jordan
|
|
|
Ron suspended ceiling; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Pending elec. and mech. ri above grid.
|
BLD-Concrete | 2/16/2007 | 2/16/2007 | 2/16/2007 | P | CANC |
Mike Jordan
|
|
|
ron - trash enclosure; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. No insp. required.
|
BLD-Energy code compliance | 1/25/2007 | 1/26/2007 | 1/26/2007 | A | PASS |
Jim Storey
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Darla Downs pending plm aproval.
|
BLD-Framing/Rough-in | 1/17/2007 | 1/19/2007 | 1/19/2007 | A | PASS |
Mike Jordan
|
|
|
RON; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok to insul. pend. plumbing. Needs to seal penetrations thru draftstops.
|
BLD-Footing | 12/5/2006 | 12/5/2006 | 12/5/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/5/2006 at 11:07:38 AM. Contact: ###-####. Footing for dumpster enclosure.
|
BLD-Other | 11/17/2006 | 11/17/2006 | 11/17/2006 | P | PART |
Mike Jordan
|
|
|
ron Note: shear wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Noted installation of misssing straps at window openings at shear walls.
|
BLD-Other | 11/9/2006 | 11/13/2006 | 11/13/2006 | A | PART |
Mike Jordan
|
|
|
david - shear; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Shear wall and roof diaphragm insp. Needs rfi from eng. deleting lsta34 straps at openings in shearwalls.
|
BLD-Framing/Rough-in | 11/9/2006 | 11/9/2006 | 11/9/2006 | P | PART |
Mike Jordan
|
|
|
ron Note: partial straps; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Verified all holdowns, straps at hip sections and at cantilevered beams and at jack trusses.
|
BLD-Footing | 9/14/2006 | 9/14/2006 | 9/14/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/14/2006 at 8:38:58 AM. Contact: ###-####.
|
BLD-Foundation | 8/29/2006 | 8/30/2006 | 8/30/2006 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/29/2006 at 8:51:42 AM. Contact: ###-####.
|
BLD-Footing | 8/25/2006 | 8/28/2006 | 8/28/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/25/2006 at 1:39:31 PM. Contact: ###-####. P"erimeter footings.
|