BLD-Final | 9/6/2007 | 9/7/2007 | 9/7/2007 | P | PASS |
Dave Hannah
|
|
|
bob Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 9/6/2007 | 9/7/2007 | 9/7/2007 | A | PASS |
Forrest France
|
|
|
Noted items required for compliance have been completed, fire life safety finaled.
|
BLD-Final | 7/11/2007 | 7/12/2007 | 7/12/2007 | P | PART |
Dave Hannah
|
|
|
bob Phone #: ###-#### ok for temp occ needs others to sign off perm and dbl door hardware gaurdes on racking
|
FIRE-Final Inspection | 7/11/2007 | 7/12/2007 | 7/12/2007 | A | PART |
Forrest France
|
|
|
Temp occupancy approved with S. Rogers permission pending satisfactory pump acceptance testing for the project related fire sprinkler permit to be completed 7/25, also need to add one exit sign at the NE door as indicated on approved plans.
|
Code Occupancy Approval | 7/5/2007 | 7/5/2007 | 7/5/2007 | P | PASS |
Joe R Venneman
|
|
|
|
Code Occupancy Approval | 7/2/2007 | 7/2/2007 | 7/2/2007 | P | PASS |
Joe R Venneman
|
|
|
|
BLD-Framing/Rough-in | 6/28/2007 | 6/29/2007 | 6/29/2007 | A | PASS |
Tom Arcoraci
|
|
|
bob Phone #: ###-####
|
BLD-Footing | 1/23/2007 | 1/24/2007 | 1/24/2007 | A | PART |
Dave Hannah
|
|
|
bob ; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok pending spec inspection
|
BLD-Foundation | 1/16/2007 | 1/16/2007 | 1/16/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/16/2007 at 7:51:31 AM. Contact: ###-####.ok pending spec inspection
|
BLD-Footing | 1/10/2007 | 1/10/2007 | 1/10/2007 | P | PART |
Dave Hannah
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Victoria Beall column ftgs ok to pour
|
BLD-Footing | 1/4/2007 | 1/4/2007 | 1/5/2007 | P | PART |
Dave Hannah
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles this is the block by the manhole
|