BLD-Final | 11/29/2006 | 11/30/2006 | 11/30/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/29/2006 at 1:38:42 PM. Contact: ###-####. OK for Perm Occ.
|
FIRE-Final Inspection | 11/16/2006 | 11/17/2006 | 11/17/2006 | P | PASS |
Forrest France
|
|
|
Required corrections have been made, inspection passed.
|
FIRE-Final Inspection | 11/14/2006 | 11/15/2006 | 11/15/2006 | A | FAIL |
Troy Cobbley
|
|
|
Provide indicator at the main exit and either remove the non required exit discharge lights or provide listed devices for the damp and cold temperatures.
|
BLD-Framing/Rough-in | 9/20/2006 | 9/21/2006 | 9/21/2006 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/20/2006 at 1:31:12 PM. Contact: ###-####.gyp on eaves ok to cover
|
BLD-Energy code compliance | 9/19/2006 | 9/19/2006 | 9/19/2006 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/19/2006 at 9:56:56 AM. Contact: ###-####. need to reinsp. for soffit fire chalking at lights/ condensate line relocated.
|
BLD-Energy code compliance | 9/18/2006 | 9/20/2006 | 9/19/2006 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/18/2006 at 11:25:00 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Sep 19 2006 9:59AM.
|
BLD-Framing/Rough-in | 9/15/2006 | 9/15/2006 | 9/15/2006 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/15/2006 at 10:53:39 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/14/2006 | 9/15/2006 | 9/14/2006 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/14/2006 at 2:42:36 PM. Disp set to [CANC] by a contractor via Hello! on Sep 14 2006 5:05PM.
|
BLD-Other | 7/26/2006 | 7/27/2006 | 7/27/2006 | A | PASS |
Dave Hannah
|
|
|
steve Note; wall stem; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 7/26/2006 | 7/26/2006 | 7/26/2006 | P | PASS |
Dave Hannah
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|