BLD-Final | 4/2/2007 | 4/2/2007 | 4/2/2007 | P | PASS |
Mike Jordan
|
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
DOC - Permit Finaled | 4/2/2007 | 4/2/2007 | 4/2/2007 | P | PASS |
Mike Jordan
|
|
|
letter of compliance issued. Final ok.
|
Code Occupancy Approval | 4/2/2007 | 4/2/2007 | 4/2/2007 | P | CANC |
Scott M.Brown
|
|
|
ALL IN AS REQUIRED FINAL OK
|
BLD-Final | 3/29/2007 | 3/30/2007 | 3/30/2007 | A | NR |
Mike Jordan
|
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
FIRE-Final Inspection | 3/23/2007 | 3/26/2007 | 3/26/2007 | A | CANC |
Troy Cobbley
|
|
|
life safety passed.
|
BLD-Other | 3/6/2007 | 3/6/2007 | 3/6/2007 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/6/2007 at 8:47:02 AM. Contact: ###-####. Draftstop installed under eve to soffit.
|
BLD-Framing/Rough-in | 2/20/2007 | 2/21/2007 | 2/21/2007 | A | CANC |
Mike Jordan
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. 2x8 scab added to girder trusses as per engineering.
|
BLD-Framing/Rough-in | 2/19/2007 | 2/20/2007 | 2/20/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/19/2007 at 9:04:40 AM. Contact: ###-####. Draft stop installed, Needs to extend to soffit.
|
BLD-Framing/Rough-in | 2/16/2007 | 2/16/2007 | 2/16/2007 | P | PART |
Mike Jordan
|
|
|
greg ; Phone #: ###-#### Internet Inspection Request from: Patricia Smit. Will call back to inspect draft stop.
|
BLD-Foundation | 9/15/2006 | 9/15/2006 | 9/15/2006 | P | PASS |
Mike Jordan
|
|
|
Note: rebar - pouring concrete at 2:00 pm; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Perimeter stemwalls.
|
BLD-Footing | 9/12/2006 | 9/13/2006 | 9/13/2006 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. wip. Needs to add additional verts at L1 openings at 16 inch jambs.
|