BLD-Final | 12/20/2007 | 12/21/2007 | 12/21/2007 | A | PASS |
Jim Sly
|
|
|
Terry, late a.m. please = ) Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt OK for Perm Occ.
|
FIRE-Final Inspection | 12/20/2007 | 12/21/2007 | 12/21/2007 | A | PASS |
Forrest France
|
|
|
Corrections verified for compliance, fire life safety passed.
|
FIRE-Final Inspection | 12/17/2007 | 12/17/2007 | 12/17/2007 | P | FAIL |
Troy Cobbley
|
|
|
Turn the hardware around on the interior door with the exit sign above it. Provide exit sign/emergency light above the exit from the existing warehouse area. Provide lever hardware on the other exit door from the existing warehouse.
|
FIRE-Final Inspection | 12/5/2007 | 12/5/2007 | 12/5/2007 | P | FAIL |
Troy Cobbley
|
|
|
Provide indicator and sticker at the main exit. Provide fire extinguishers as discussed. Provide exit sign/emergency light at the warehouse door as discussed. The fire dept. access needs worked out with the new buildings access.
|
BLD-Conference | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | DONE |
Jim Sly
|
|
|
terry Note: please call 1/2 hr prior to conference Phone #: ###-#### Re.for final...
|
FIRE-Conference | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | DONE |
Troy Cobbley
|
|
|
I went over life safety requirements with terry.
|
BLD-Other | 3/28/2007 | 3/29/2007 | 3/29/2007 | A | NH |
Jim Sly
|
|
|
Josh Fireplace pls call 30 min prior; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Framing/Rough-in | 12/21/2006 | 12/22/2006 | 12/22/2006 | P | PASS |
Jim Sly
|
|
|
Calvin; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Wall cover | 12/18/2006 | 12/18/2006 | 12/19/2006 | P | PART |
Dave Hannah
|
|
|
sheldon ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith still needs mec rough ins and fire sprinkler rough in needs to fire block above fire places had letter from engineer oking post to beam connections
|
BLD-Conference | 9/6/2006 | 9/7/2006 | 9/7/2006 | A | DONE |
Jim Sly
|
|
|
jeremy; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Conference | 9/1/2006 | 9/5/2006 | 9/5/2006 | A | FAIL |
Jim Sly
|
|
|
jeremy; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley C/N Non complying stairway, Post Beam connections not per Approved Plan....Not insp by special inspector (welds)
|
BLD-Footing | 8/22/2006 | 8/23/2006 | 8/23/2006 | P | PART |
Jim Sly
|
|
|
jeremy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Remainder of footing pads appear OK.......Advised for cylinder tests/ special insp......Need 2500 PSI They are mixing a proprietary product in a portable mixer.
|
BLD-Foundation | 8/17/2006 | 8/18/2006 | 8/18/2006 | A | PART |
Tony Young
|
|
|
sheldon; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles only the 3 stair ftgs are ok to pour,, the others are not ready,, need to be the size shown on engineering
|