Permit Information
Permit NumberBLD06-01893
StatusFinaled
Name FALASH & ROSS CONSTRUCTION
Site Address 1010 W JEFFERSON ST 200
Project Name1010 JEFFERSON LLC BLDG
Customer Number 
ePlanReviewNo
Description
(RCE 2502 - FALASH & ROSS CONSTRUCTION) (LE MASTER & DANIELS - 2ND STORY) Only the basement of this building is fire sprinklered. To construct an 8,292 square foot whole floor office tenant space on the 2nd story of an existing building. The elevator was constructed and the roof top HVAC units were installed under permit BLD06-00879. The restrooms were going to be constructed under that permit but will instead be constructed under this permit. Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, interior doors, interior windows, an interior glass block wall, millwork, interior finishes, and suspended ceilings. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection3/1/20073/1/20073/1/2007PPASS
DetailsForrest France
Required correction has been field verified for completion, fire life safety finaled.
BLD-Final2/28/20073/1/20073/1/2007PPASS
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for perm occ
Permanent Occupancy 3/1/20073/1/2007 DONE
Details
BLD-Final2/23/20072/26/20072/26/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/23/2007 at 7:34:47 PM. Contact: ###-####. ok for perm occ after other trades sign off perm
FIRE-Final Inspection12/15/200612/15/200612/15/2006PPASS
DetailsForrest France
Fire life safety inspection passed, one missing exit discharge light at the second required exit fire escape stairs to be installed and verified for compliance prior to structural final as agreed.
BLD-Final12/14/200612/15/200612/15/2006APART
DetailsDave Hannah
This is for a final & fire/life & safety. Please contact Greg Bolton prior to going out at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok for temp occ
BLD-Final12/14/200612/14/200612/14/2006PFAIL
DetailsDave Hannah
This is for a Fire/Life/Safety & Structural Final. Please contact Greg Bolton prior to going out at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson needs other trades finaled
BLD-Final12/13/200612/14/200612/14/2006AFAIL
DetailsDave Hannah
This is for a Fire/Life/Safety & Structural Final. Please contact Greg Bolton prior to going out at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
FIRE-Final Inspection12/14/200612/14/200612/14/2006ANR
DetailsForrest France
Pending project related fire alarm permit final.
BLD-Other11/9/200611/9/200611/9/2006PPART
DetailsDave Hannah
This is for a ceiling inspection. Please contact Greg Bolton @ ###-#### prior to going out. Thank You; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to cover ceilings after elec oks
BLD-Conference11/6/200611/7/200611/7/2006APASS
DetailsDave Hannah
Please call prior to coming out. Thank You; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
BLD-Conference11/2/200611/2/200611/2/2006PPEND
DetailsDave Hannah
Please call Greg Bolton @ ###-#### prior to going to site. Thank You; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
BLD-Framing/Rough-in9/22/20069/22/20069/22/2006PPART
DetailsDave Hannah
If you have any questions please contact Greg Bolton at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to cover int walls
BLD-Framing/Rough-in9/14/20069/15/20069/15/2006APART
DetailsJim Sly
We are needing this first thing in the morning if possible. If you have any questions please contact Greg Bolton @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
Walls OK to cover.......Leave open areas to check sealing of floor penitrations and completion of 2hr shaft. Asked framer to add top of wall bracing in selected areas. Advised to contact Architect to verify what type of install for celing grid (contradiction in plans)....and reminded of 34" max counter in break room.