FIRE-Final Inspection | 7/9/2008 | 7/10/2008 | 7/10/2008 | A | PASS |
Forrest France
|
|
|
C/N items verified for compliance, fire life safety final inspection passed.
|
FIRE-Final Inspection | 7/2/2008 | 7/3/2008 | 7/3/2008 | A | FAIL |
Forrest France
|
|
|
Smoke alarms at each unit must meet installation guidelines per NFPA 72 chapter 11, also see fire code review notes on approved plan set for details.
|
FIRE-Final Inspection | 7/1/2008 | 7/2/2008 | 7/2/2008 | A | DEFR |
Forrest France
|
|
|
AM inspections overbooked, contractor rescheduled for 7/3 per agreement.
|
FIRE-Final Inspection | 5/14/2008 | 5/15/2008 | 5/15/2008 | A | FAIL |
Forrest France
|
|
|
Need approved plans and fire code review notes available on site, missing knox box, per contractor no fire extinguishers have been provided, lacking vehicle impact protection at the three new hydrants due to incomplete site work/curbing, will need access to each unit to test smoke alarms.
|
BLD-Final | 5/9/2008 | 5/9/2008 | 5/9/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/9/2008 at 1:36:26 AM. Contact: ###-####. ok for perm occ
|
BLD-Other | 4/21/2008 | 4/22/2008 | 4/24/2008 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/21/2008 at 4:50:20 PM. Contact: ###-####.
|
Code Occupancy Approval | | | 4/23/2008 | | DONE |
|
|
|
Landscaping and striping meet requirements
|
BLD-Final | 3/24/2008 | 3/24/2008 | 3/24/2008 | P | NH |
Forrest France
|
|
|
|
BLD-Final | 12/19/2007 | 12/21/2007 | 12/21/2007 | A | NR |
Dave Hannah
|
|
|
steve Note: 1st 10 Phone #: ###-#### needs to get fire and zoning finals
|
BLD-Energy code compliance | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | PASS |
Dave Hannah
|
|
|
steve ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover
|
BLD-Framing/Rough-in | 4/26/2007 | 4/27/2007 | 4/27/2007 | A | PASS |
Dave Hannah
|
|
|
Steve; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to insulate last five units
|
BLD-Energy code compliance | 4/23/2007 | 4/23/2007 | 4/23/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/23/2007 at 8:13:45 AM. Contact: ###-####.first five units ok to cover
|
BLD-Framing/Rough-in | 4/18/2007 | 4/19/2007 | 4/19/2007 | A | CANC |
Dave Hannah
|
|
|
stu; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles first five units of bldg no. one ok to insulate
|
BLD-Framing/Rough-in | 1/31/2007 | 2/1/2007 | 2/2/2007 | A | PART |
Dave Hannah
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Beall second floor fire walls ok
|
BLD-Foundation | 12/8/2006 | 12/11/2006 | 12/11/2006 | A | PART |
Dave Hannah
|
|
|
STEVE nOTE: LAST INS BEFORE NOON IF POSSIBLE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 12/8/2006 | 12/8/2006 | 12/8/2006 | P | PASS |
Dave Hannah
|
|
|
STEVE nOTE: IF POSSIBLE RIGHT AFTER LUNCH - THANKS; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 12/4/2006 | 12/5/2006 | 12/5/2006 | P | PART |
Dave Hannah
|
|
|
steve - as early afternoon as possible ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith west half bld 1a ok to pour
|
BLD-Final | 7/16/2008 | 7/16/2008 | | P | |
|
|
|
verified that all trades have been signed off _ Dave Hannah did a fn insp--per Bob Archibald do not need to print an Occ card..just note it in screen-mls
|