BLD-Final | 4/20/2007 | 4/23/2007 | 4/23/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/20/2007 at 3:40:32 PM. Contact: ###-####.
|
DOC - Permit Finaled | 4/23/2007 | 4/23/2007 | 4/23/2007 | P | PASS |
Mike Jordan
|
|
|
Received copy of final aff. letter from special insp agency as well as a letter from engineer of record noting and accepting non conformances from special inspections. Letter of Compliance was issued for shell and core.
|
BLD-Final | 4/18/2007 | 4/19/2007 | 4/19/2007 | A | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/18/2007 at 2:22:58 PM. Contact: ###-####. Needs to resolve issues on final aff. with project engineer.
|
BLD-Final | 4/16/2007 | 4/17/2007 | 4/17/2007 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/16/2007 at 4:52:47 PM. Contact: ###-####.. Handrail mounted at wrong height. Needs to install hc sighn at restrooms.
|
FIRE-Final Inspection | 4/16/2007 | 4/17/2007 | 4/17/2007 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
Code Occupancy Approval | 4/12/2007 | 4/12/2007 | 4/12/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL.
|
BLD-Energy code compliance | 2/15/2007 | 2/16/2007 | 2/16/2007 | A | PASS |
Mike Jordan
|
|
|
Framing ok. Energy ok. pending fire sprinkler ri insp.
|
BLD-Energy code compliance | 2/14/2007 | 2/15/2007 | 2/16/2007 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/14/2007 at 4:49:07 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/9/2007 | 2/12/2007 | 2/12/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/9/2007 at 3:55:29 PM. Contact: ###-####. ok to insul. Needs to get fire sprinkler issues resolved.
|
BLD-Framing/Rough-in | 12/6/2006 | 12/7/2006 | 12/7/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/6/2006 at 2:40:43 PM. Contact: ###-####. Shear nailing on roof. ok to cover. Noted contractor had changed type of truss used. Approved engimeering from manufacturer on site. Noted to contractor to have changes made with structural engineer also.
|
BLD-Foundation | 10/2/2006 | 10/3/2006 | 10/3/2006 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/2/2006 at 12:41:42 PM. Contact: ###-####. Perimeter stemwalls, loading dock walls, center stemwall.
|
BLD-Footing | 9/25/2006 | 9/27/2006 | 9/27/2006 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/25/2006 at 3:14:39 PM. Contact: ###-####. Perimeter footings and footing down center of bldg.
|
BLD-Footing | 9/25/2006 | 9/26/2006 | 9/26/2006 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/25/2006 at 1:09:11 PM. Contact: ###-####.
|