BLD-Final | 1/30/2008 | 1/31/2008 | 1/31/2008 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/30/2008 at 3:29:40 PM. Contact: ###-####.
|
DOC - Permit Finaled | 1/31/2008 | 1/31/2008 | 1/31/2008 | P | PASS |
Mike Jordan
|
|
|
Letter of compliance issued. Verified all required signatures.
|
FIRE-Final Inspection | 1/8/2008 | 1/9/2008 | 1/9/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Energy code compliance | 10/26/2007 | 10/26/2007 | 10/26/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/26/2007 at 6:35:42 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/23/2007 | 10/24/2007 | 10/24/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/23/2007 at 11:53:26 AM. Contact: ###-####.
|
Code Occupancy Approval | 9/19/2007 | 9/19/2007 | 9/19/2007 | A | PASS |
Scott M.Brown
|
|
|
ok for final
|
FIRE-Conference | 8/24/2007 | 8/27/2007 | 8/27/2007 | A | DONE |
Troy Cobbley
|
|
|
The front exterior canopy has been filled with insulation. Ok to cover.
|
BLD-Framing/Rough-in | 6/27/2007 | 6/28/2007 | 6/28/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/27/2007 at 5:14:07 PM. Contact: ###-####. Shear nailing on roof diaphragm, ledger connection to cmu wall. ok.
|
BLD-Foundation | 4/16/2007 | 4/16/2007 | 4/16/2007 | P | DEFR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/16/2007 at 9:42:27 AM. Contact: ###-####.
|
BLD-Foundation | 4/12/2007 | 4/12/2007 | 4/12/2007 | P | PASS |
Mike Jordan
|
|
|
Keith ###-####
|