Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-02012
StatusFinaled
Name T2 DEVELOPMENT LLC
Site Address 8534 W ELISA ST
Project NameVictory Business Park BLD B
Customer Number 
ePlanReviewNo
Description
Victory Business Park - Building "B" 8534 & 8536 W Elisa St per Addressing- To build a new 17,925 square foot, one story with mezzanine office and warehouse building and related site improvements. The total mezzanine area is 1480 square feet. This building is constructed of masonry exterior walls and wood framed interior and roof system. This building is divided down the middle with an 8 inch masonry wall create two identical tenant spaces that mirror each other. If there are no tenants at this time a separate MIS permit will be required for each tenant space to obtain occupancy. All construction per the approved plans and attached comment list. JCM (Note: This building has been granted a letter of map revision by FEMA on 5/31/06 to remove it from floodplain requirements. Copy of letter on file.)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/30/20081/31/20081/31/2008APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/30/2008 at 3:29:40 PM. Contact: ###-####.
DOC - Permit Finaled1/31/20081/31/20081/31/2008PPASS
DetailsMike Jordan
Letter of compliance issued. Verified all required signatures.
FIRE-Final Inspection1/8/20081/9/20081/9/2008APASS
DetailsTroy Cobbley
Life safety passed.
BLD-Energy code compliance10/26/200710/26/200710/26/2007PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/26/2007 at 6:35:42 AM. Contact: ###-####.
BLD-Framing/Rough-in10/23/200710/24/200710/24/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/23/2007 at 11:53:26 AM. Contact: ###-####.
Code Occupancy Approval9/19/20079/19/20079/19/2007APASS
DetailsScott M.Brown
ok for final
FIRE-Conference8/24/20078/27/20078/27/2007ADONE
DetailsTroy Cobbley
The front exterior canopy has been filled with insulation. Ok to cover.
BLD-Framing/Rough-in6/27/20076/28/20076/28/2007APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/27/2007 at 5:14:07 PM. Contact: ###-####. Shear nailing on roof diaphragm, ledger connection to cmu wall. ok.
BLD-Foundation4/16/20074/16/20074/16/2007PDEFR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/16/2007 at 9:42:27 AM. Contact: ###-####.
BLD-Foundation4/12/20074/12/20074/12/2007PPASS
DetailsMike Jordan
Keith ###-####