Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD06-02030
StatusExpired
Name SHILOH DEVELOPMENT LTD CO
Site Address 1859 S WINDSTAR PL
Project Name 
Customer Number 
ePlanReviewNo
Description
***UPDATED EXISTING APPROVED PLANS ON 1/12/07 TO INCLUDE: ADDING 96SQ.FT. TO THE MASTER BEDROOM AS PER APPROVED SHEET S-1.2, ATTACHED ENGINEERING DATED 1/5/07, AND NEW RES-CHECK. NEW SQ.FT. IS 4840SQ.FT. *** "CONTRACTOR CHARLES NILLES FOR SHILOH DEVELOPMENT REGISTRATION NUMBER RCE-465" To construct a 4744sq.ft., Four bedroom, Four bathroom, Two powder bath, Three story single family dwelling (1621sq.ft. Lower floor plan / 2319sq.ft. Main floor / 342sq.ft. Upper floor / 462sq.ft. Storage) with a main floor Covered rear deck, and a 908sq.ft. Attached garage per approved plans, all red-lining, Engineering, and Plan review report. This lot is within the hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. HILLSIDE FOUNDATION DESIGNS. Dwellings; townhouse units; additions to same and detached structures constructed in areas falling under the purview of the "Boise City Hillside Ordinance", shall have foundation designs signed and sealed by a professional engineer licensed by the State of Idaho, and qualified in the engineering specialty involved. (Boise City Code 4-02-44) This house shall be fitted with an NFPA 13D system, modified to include a single row of dry sidewall sprinklers along all walls common to attached garage and the living space. The system shall also be equipped with an alarm initiating device commonly referred to as a flow switch, and an outside alarm indicating device. A Fire Sprinkler Permit is required prior to beginning any fire sprinkler work. Any and all NFPA 13D systems shall be equipped with an alarm initiating device commonly referred to as a flow switch, and an outside alarm indicating device. R-1A/DA Zoning district, building setbacks, CAR00-00021/DA, CUP02-00047, and CFH02-00006 per Bruce Eggleston with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Grading Inspection7/12/20077/12/20077/12/2007 BOND
The rough grading and drainage has been completed. However, revegetation has not been completed. For this the engineer has recommended a bond of $1,000.00. Upon receipt of this bond the grading and drainage is conditionally approved.
BLD-Framing/Rough-in5/10/20075/11/20075/11/2007PPASS
DetailsDave Hannah
steve ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Energy code compliance5/11/20075/11/20075/11/2007PPASS
DetailsDave Hannah
steve ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in5/1/20075/3/20075/3/2007PPASS
DetailsDave Hannah
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to insulate
BLD-Framing/Rough-in4/30/20075/1/20075/1/2007PNR
DetailsJim Storey
Steve; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman
BLD-Framing/Rough-in3/20/20073/21/20073/21/2007PCANC
DetailsDave Hannah
Steve; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
BLD-Framing/Rough-in3/16/20073/20/20073/20/2007PFAIL
DetailsDave Hannah
steve ; Phone #: ###-#### Internet Inspection Request from: Staci Backus needs fire sprinkler permit and rough in be for framing inspection
BLD-Framing/Rough-in3/16/20073/19/20073/19/2007ACANC
DetailsDave Hannah
steve ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith changed to 3/20/07
BLD-Framing/Rough-in3/13/20073/14/20073/14/2007AFAIL
DetailsTony Young
chuck ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
c/n posted,, do not insulate
BLD-Other3/6/20073/7/20073/7/2007APART
DetailsDave Hannah
Steve Sheer Wall; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ok to cover ext
BLD-Other3/5/20073/6/20073/6/2007AFAIL
DetailsDave Hannah
steve or ralph ###-#### shear wall inspection; Phone #: ###-#### Internet Inspection Request from: Victoria Beall c/n on site
BLD-Concrete1/8/20071/9/20071/9/2007APART
DetailsJim Sly
steve - wall inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Final small section of wall OK
BLD-Footing1/5/20071/5/20071/8/2007PPART
DetailsDave Hannah
steve ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Footing12/22/200612/22/200612/22/2006PNR
DetailsTony Young
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
BLD-Concrete11/29/200611/30/200611/30/2006APART
DetailsDave Hannah
steve ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Footing11/29/200611/29/200611/29/2006PPASS
DetailsJim Storey
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Foundation11/16/200611/17/200611/17/2006APART
DetailsDave Hannah
clint Note: walls; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles radius wall ok to pour
BLD-Foundation11/8/200611/9/200611/9/2006APART
DetailsDave Hannah
Clint; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to pour first section of walls
BLD-Framing/Rough-in10/30/200610/31/200610/31/2006APART
DetailsDave Hannah
Clint; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to pour first section of ftgs
BLD-Final7/12/20077/13/2007 P 
DetailsDave Hannah
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang