BLD-Final | 9/10/2010 | 9/13/2010 | 9/13/2010 | P | PASS |
Mike Jordan
|
|
|
Marty Phone #: ###-####
|
DOC - Permit Finaled | 9/13/2010 | 9/13/2010 | 9/13/2010 | P | PASS |
Mike Jordan
|
|
|
letter of compliance issued.
|
FIRE-Final Inspection | 9/10/2010 | 9/13/2010 | 9/13/2010 | A | PASS |
Troy Cobbley
|
|
|
life safety already passed.
|
FIRE-Final Inspection | 9/8/2010 | 9/9/2010 | 9/9/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 9/8/2010 | 9/9/2010 | 9/9/2010 | A | NR |
Mike Jordan
|
|
|
marty Phone #: ###-####
|
BLD-Aging Inspection | 8/26/2010 | 8/26/2010 | 8/26/2010 | | PASS |
Mike Jordan
|
|
|
Work is in progress.
|
BLD-Conference | 6/15/2010 | 6/15/2010 | 6/15/2010 | P | PASS |
Mike Jordan
|
|
|
Per Bob A. ok to reopen expired trades permits and charge 2hr. admin fee.
|
BLD-Aging Inspection | 5/17/2010 | 5/17/2010 | 5/18/2010 | | PASS |
Mike Jordan
|
|
|
Building has been sold and ti work is in progress.
|
FIRE-Final Inspection | 9/2/2008 | 9/3/2008 | 9/3/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide the permanent address, provide sticker "door to remain unlocked when building is occupied" at the main exit, provide approved hardware on the remaining exterior exit doors and provided "issued" tenant improvement plans or the shell scope of work needs to be changed to reflect the revised interior wall layout.
|
BLD-Energy code compliance | 8/29/2008 | 8/29/2008 | 8/29/2008 | P | PASS |
Mike Jordan
|
|
|
marty Phone #: ###-####
|
BLD-Final | 1/15/2008 | 1/15/2008 | 1/15/2008 | P | CANC |
Mike Jordan
|
|
|
marty Phone #: ###-####
|
BLD-Energy code compliance | 1/15/2008 | 1/15/2008 | 1/15/2008 | P | PASS |
Mike Jordan
|
|
|
marty Phone #: ###-####. Shell and core framing only is ok. ok to insul. exterior walls only.
|
BLD-Final | 7/19/2007 | 7/19/2007 | 7/19/2007 | P | PART |
Mike Jordan
|
|
|
marty Phone #: ###-####. Needs to provide truss engineering. Will complete framing insp. when insp for ti is ready. Will need to resubmit floor plan noting deletion of tenant demising wall.
|
BLD-Final | 7/16/2007 | 7/16/2007 | 7/16/2007 | P | NR |
Mike Jordan
|
|
|
marty Phone #: ###-####. Provide approved plans and truss engineering. Needs to complete airseal package. c/n posted.
|
BLD-Framing/Rough-in | 6/14/2007 | 6/14/2007 | 6/14/2007 | P | PART |
Mike Jordan
|
|
|
marty; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. Exterior shear nailing ok. Needs to provide non shrink grout under baseplates of ts columns. Prior to sign off of shell and core, plans will be resubmitted to reflect deletion of tenant demissing wall.
|
BLD-Foundation | 3/7/2007 | 3/8/2007 | 3/8/2007 | A | PART |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Victoria Beal. wip. repairs being made.
|
BLD-Foundation | 3/7/2007 | 3/7/2007 | 3/7/2007 | P | FAIL |
Mike Jordan
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Missing #5 verts from column pad footings for front canopy. #3 ties installed improperly. Will needs rfi from engineer for epoxy and special insp.
|
BLD-Footing | 3/2/2007 | 3/5/2007 | 3/5/2007 | P | PART |
Mike Jordan
|
|
|
donnie ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. wip. Went over plans withj contractor. Noted to contractor that special insp. is required.
|