Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD06-02052
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 251 E FRONT ST Unit: 305
Project NameONE FRONT ST-3RD FLR
Customer Number 
ePlanReviewNo
Description
Kreizenbeck Constructors RCE # 764 (NO TENANT - VANILLA FINISH)(ONE FRONT STREET - STE 305) This building is fully sprinklered as substitution for 1-hour fire resistive construction. There is an existing 1-hour rated corridor connecting the 2-hour stair enclosures that serve as the exits for all tenants on this floor. To build-out interior finishes for a NEW "VANILLA" FINISH space of 2,884 sq. ft. for proposed future office.The remainder of this floor is occupied by Edam & Burke. Work includes non-combustible framing & furr out around columns and stair enclosure; non-combustible framed partitions to create rooms & areas for future reception, conference and open office. To perform work on electrical, mechanical, plumbing, sprinkler and alarm systems to comply with current adopted codes and ordinances of Boise City. To modify a section of the existing rated corridor to relocate & install a new 20 minute fire rated, smoke and draft control, self closing, door and frame as the new entry door and install a 45 minute fire rated glazed sidelite and frame. Install a suspended ceiling grid system, diffusers and light fixtures and finish interior walls of "Vanilla" space for a future, yet to be determined tenant. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/17/20071/18/20071/18/2007APASS
DetailsDave Hannah
erin; Phone #: ###-#### Internet Inspection Request from: Darla Downs
DOC - Permit Finaled1/18/20071/18/20071/18/2007PPASS
DetailsDave Hannah
FIRE-Final Inspection1/15/20071/16/20071/16/2007APASS
DetailsForrest France
Fire life safety inspection is satisfactory.
BLD-Other11/16/200611/17/200611/17/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/16/2006 at 5:51:10 PM. Contact: ###-####.ceiling grid ok to cover
BLD-Other11/16/200611/17/200611/16/2006ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/16/2006 at 9:50:53 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Nov 16 2006 5:56PM.
BLD-Framing/Rough-in10/9/200610/10/200610/10/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/9/2006 at 12:16:05 PM. Contact: ###-####. walls ok to cover