Code Occupancy Approval | 9/11/2007 | 9/11/2007 | 9/11/2007 | P | CANC |
Joe R Venneman
|
|
|
|
Code Occupancy Approval | 9/11/2007 | 9/11/2007 | 9/11/2007 | P | PASS |
Joe R Venneman
|
|
|
|
BLD-Final | 9/5/2007 | 9/6/2007 | 9/6/2007 | A | PASS |
Dave Hannah
|
|
|
Scott; Phone #: ###-#### Internet Inspection Request from: Hattie James ok for perm occ
|
BLD-Final | 6/13/2007 | 6/14/2007 | 6/14/2007 | P | PART |
Dave Hannah
|
|
|
scott - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok for temp occ on west half
|
BLD-Final | 5/31/2007 | 6/1/2007 | 6/1/2007 | A | PART |
Dave Hannah
|
|
|
scott - pls call 30 mins prior; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to occ east wing
|
FIRE-Final Inspection | 5/31/2007 | 5/31/2007 | 5/31/2007 | P | PASS |
Forrest France
|
|
|
Corrections are complete, fire life safety inspection passed.
|
FIRE-Final Inspection | 5/29/2007 | 5/30/2007 | 5/30/2007 | P | FAIL |
Forrest France
|
|
|
Provide approved door hardware at four locations, repair and retest emergency exit discharge lights on both the first and second floors.
|
BLD-Conference | 5/22/2007 | 5/23/2007 | 5/23/2007 | A | CANC |
Dave Hannah
|
|
|
scott - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Framing/Rough-in | 3/8/2007 | 3/8/2007 | 3/8/2007 | P | PART |
Dave Hannah
|
|
|
matf; Phone #: ###-#### Internet Inspection Request from: Victoria Beall framing ok but need to fire block walls
|
BLD-Conference | 2/27/2007 | 2/28/2007 | 2/28/2007 | A | PART |
Dave Hannah
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Victoria Beall shafts ok in lounge area
|
BLD-Conference | 2/26/2007 | 2/27/2007 | 2/27/2007 | P | PART |
Dave Hannah
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Victoria Beall handrails and gaurd rails
|
BLD-Framing/Rough-in | 2/2/2007 | 2/2/2007 | 2/5/2007 | P | PART |
Dave Hannah
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Victoria Beall rooms not much change
|
BLD-Concrete | 1/10/2007 | 1/10/2007 | 1/10/2007 | P | PASS |
Dave Hannah
|
|
|
dean - late as possible ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to pour ftgs for stairs
|
BLD-Foundation | 1/5/2007 | 1/8/2007 | 1/9/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/5/2007 at 4:38:45 PM. Contact: ###-####.
|
BLD-Footing | 1/4/2007 | 1/5/2007 | 1/8/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/4/2007 at 3:37:14 PM. Contact: ###-####.ftgs for cmu wall
|
BLD-Concrete | 11/13/2006 | 11/13/2006 | 11/13/2006 | P | PASS |
Dave Hannah
|
|
|
dean Note: after 1:00 pm Mud is coming 11:30 tomarrow morning; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|