Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD06-02102
StatusFinaled
Name RADIX CONSTRUCTION INC
Site Address 2589 S FIVE MILE RD
Project NameAURORESKY BLDG #1
Customer Number 
ePlanReviewNo
Description
(Auroresky Building #1 - Shell) To construct a new 3,100 square foot, one story with 940 square foot mechanical and storage basement , wood framed office shell building and related site improvements. This is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permit are required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/30/201210/31/201210/31/2012APASS
DetailsMike Jordan
Tony O''Neil Phone #: ###-####
DOC - Permit Finaled10/31/201210/31/201210/31/2012PPASS
DetailsMike Jordan
On site to meet with Tony O'Niel with radix construction to inspect and final out shell and core permit. Noted that plumbing has been rough in and inspected. Fixtures need to be installed and connected. Hvac sysytems installed and main trunk lines installed, Branch lines still need to be installed. Also noted that ADA elements still need to be instaleed as well as a code compliant handrail in one hour stair enclosure. Spoe to Sam Zahorka regarding above issues and will be addresed in the tenant improvement.
BLD-Aging Inspection11/24/201011/24/201011/24/2010 CANC
DetailsMike Jordan
DOC - Permit Expired11/24/201011/24/201011/24/2010PPASS
DetailsMike Jordan
Cannot get ahold of owner to get final complete. Work appears to have been comlpleted.
FIRE-Final Inspection10/10/200710/10/200710/10/2007APASS
DetailsTroy Cobbley
life safety passed
BLD-Final10/10/200710/10/200710/10/2007ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/10/2007 at 7:18:16 AM. Contact: ###-####.
BLD-Other8/8/20078/8/20078/8/2007PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/8/2007 at 10:45:59 AM. 1hr stair assembly ok.
BLD-Energy code compliance7/29/20077/30/20077/30/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/29/2007 at 9:33:39 PM.
BLD-Framing/Rough-in7/25/20077/25/20077/25/2007APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/25/2007 at 7:06:35 AM. Contact: (208) ok to insulate are fire dampers required in floor assmb
BLD-Other6/13/20076/13/20076/13/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/13/2007 at 7:15:18 AM. Exterior shear nailing.
BLD-Foundation5/2/20075/3/20075/3/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/2/2007 at 3:36:19 PM. Contact: ###-####.
BLD-Footing4/30/20075/1/20075/1/2007APART
DetailsTony Young
Scheduled by a contractor via Hello! on 4/30/2007 at 3:02:12 PM. Contact: ###-####.
c/n posted to get a min of 8" thick ftgs,, ok to pour after
BLD-Foundation4/19/20074/20/20074/20/2007APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 4/19/2007 at 2:41:14 PM. Contact: ###-####.
basement walls ok
BLD-Footing4/12/20074/13/20074/13/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/12/2007 at 3:37:14 PM. Contact: ###-####.