BLD-Aging Inspection | 11/24/2010 | 11/24/2010 | 11/24/2010 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Expired | 11/24/2010 | 11/24/2010 | 11/24/2010 | P | PASS |
Mike Jordan
|
|
|
Can not get a hold of owner to schedule final. Work appears to be completed.
|
FIRE-Final Inspection | 10/22/2007 | 10/22/2007 | 10/22/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 10/10/2007 | 10/10/2007 | 10/10/2007 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/10/2007 at 7:25:15 AM.
|
FIRE-Final Inspection | 10/10/2007 | 10/10/2007 | 10/10/2007 | A | FAIL |
Troy Cobbley
|
|
|
Repair exit signs/emergency lights.
|
BLD-Other | 5/10/2007 | 5/10/2007 | 5/10/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/10/2007 at 8:39:27 AM. Stair enclosure ok.
|
BLD-Other | 5/7/2007 | 5/8/2007 | 5/8/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/7/2007 at 5:31:44 PM. Contact: ###-####. Fireblocking complete. Blocking at one 1hr enclosure added. ok to cover.
|
BLD-Energy code compliance | 5/7/2007 | 5/7/2007 | 5/7/2007 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/7/2007 at 7:22:58 AM. Fireblocking not complete. Needs to install blocking at 1hr walls to maintain nailing pattern per approved assembly.
|
BLD-Energy code compliance | 5/2/2007 | 5/3/2007 | 5/3/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/2/2007 at 12:58:15 PM. Needs to fireblock mech. enclosure, Provide additiuonal nailing on 5/8 typex behind duct work at 1hr enclosure. c/n posted, ok to rock.
|
BLD-Wall cover | 4/22/2007 | 4/23/2007 | 4/23/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/22/2007 at 3:13:30 P ok to insul.
|
BLD-Other | 4/17/2007 | 4/17/2007 | 4/17/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/17/2007 at 7:43:00 AM.
|
BLD-Foundation | 3/6/2007 | 3/7/2007 | 3/7/2007 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/6/2007 at 4:21:54 PM. Contact: ###-####. OK Pending MTI special insp, tests, and approvals.
|
BLD-Framing/Rough-in | 2/27/2007 | 2/27/2007 | 2/27/2007 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/27/2007 at 8:49:27 AM.
|
BLD-Framing/Rough-in | 2/7/2007 | 2/8/2007 | 2/8/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/7/2007 at 1:59:20 PM. shear nailing on exterior walls and roof ok. Also went over 1hr exit enclosure requirements.
|
BLD-Foundation | 2/6/2007 | 2/7/2007 | 2/7/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/6/2007 at 6:19:48 PM. Contact: ###-####. Basementwall.
|
BLD-Footing | 2/6/2007 | 2/7/2007 | 2/7/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/6/2007 at 6:18:01 PM. Contact: ###-####.
|
BLD-Foundation | 1/31/2007 | 1/31/2007 | 1/31/2007 | P | DEFR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/31/2007 at 8:28:54 AM. Contact: ###-####. Conc. already placed when on site. Special insp. was performed.
|
BLD-Footing | 1/25/2007 | 1/25/2007 | 1/25/2007 | P | DEFR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/25/2007 at 8:32:41 AM. Contact: ###-####. Conc. placement completed when on site. Work had special insp.
|
BLD-Foundation | 1/16/2007 | 1/16/2007 | 1/16/2007 | P | DEFR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/16/2007 at 8:25:33 AM. Contact: ###-####. special insp.
|
BLD-Footing | 1/11/2007 | 1/11/2007 | 1/11/2007 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/11/2007 at 9:34:33 AM. Contact: ###-####. Perimeter and interior footing. Will recievbe special insp.
|
BLD-Foundation | 1/5/2007 | 1/5/2007 | 1/5/2007 | P | DEFR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/5/2007 at 7:31:48 AM. Contact: ###-####. Contractor had special insp. Placed conc. in am.
|
BLD-Footing | 12/27/2006 | 12/28/2006 | 12/28/2006 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/27/2006 at 2:14:21 PM. Contact: ###-####. No one on site, no access to approved plans, job trailer locked. No insp. performed. c/n posted.
|
BLD-Conference | 12/20/2006 | 12/20/2006 | 12/20/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/20/2006 at 10:01:32 AM. Contact: ###-####. Contractor has started on the first offfice bldg. Needs letter from engineer to delete special insp. requirements. Also noted to contractor that cold weather requirements willl be inforced for concrete const.
|