Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-02108
StatusFinaled
Name GB MANNISTO INC
Site Address 330 N MILWAUKEE ST
Project NameTHE CHEESECAKE FACTORY BTS
Customer Number 
ePlanReviewNo
Description
(Cheesecake Factory at Boise Towne Square) To construct a 9,488 sq. ft. restaurant with and fenced in storage/equipment area on the south side of the Boise Towne Square Mall. Building is a 9,488 sq. ft. one story Type IIB fully fire sprinkled with no openings into the existing mall building. Other work includes all site improvements, landscaping and paving per approved plans and attachments, DRH04-00219Mod # 2. Fire sprinklers are used for an unlimited area mall building. This building including the new addition is to maintain 60 foot open yards.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/5/200612/5/200612/5/2006PPASS
DetailsMike Jordan
neal; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Ok for perm occ.
Code Occupancy Approval  12/5/2006 PASS
landscape in, final signed off and release of bond.
BLD-Final11/24/200611/24/200611/24/2006PPASS
DetailsJim Storey
NEIL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles temp ok pending all others
FIRE-Final Inspection11/24/200611/24/200611/24/2006PPASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Final Inspection11/22/200611/22/200611/24/2006PPASS
DetailsTroy Cobbley
Life safety finaled
Code Occupancy Approval Temp11/21/200611/21/200611/21/2006PDONE
DetailsScott M.Brown
NEEDS TO BOND FOR LANDSCAPE $33,000
FIRE-Conference11/16/200611/17/200611/17/2006APASS
DetailsTroy Cobbley
Went over maximum occupant load signs and their location with the general contractor.
BLD-Other11/16/200611/16/200611/16/2006PPASS
DetailsMike Jordan
neil Note: suspended ceiling t-Bars ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in11/3/200611/3/200611/3/2006PPART
DetailsMike Jordan
neil - note: suspended ceiling ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. grid in back work areas only. pending other trades insp.
FIRE-Conference10/25/200610/26/200610/26/2006ADONE
DetailsTroy Cobbley
Discussed pull station placement for the hood systems. Where they want to place them does not meet code
BLD-Framing/Rough-in10/24/200610/24/200610/24/2006PCANC
DetailsMike Jordan
neil ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in10/23/200610/23/200610/23/2006PPASS
DetailsMike Jordan
neil ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Interior framed walls.
BLD-Energy code compliance10/23/200610/23/200610/23/2006PPASS
DetailsMike Jordan
neil ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in10/19/200610/19/200610/20/2006PPART
DetailsMike Jordan
neil; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Ok to rock Walls at existing cmu walls. Ok rock sides on walls at ceiling, will leave soffitt open.
BLD-Framing/Rough-in10/17/200610/17/200610/17/2006PPART
DetailsMike Jordan
neil; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. ok to rock soffitt at service counter. May one interior walls.
BLD-Framing/Rough-in10/12/200610/13/200610/13/2006ACANC
DetailsMike Jordan
john - note: insulation also - early as possible ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in10/11/200610/13/200610/13/2006ACANC
DetailsMike Jordan
nell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance10/13/200610/13/200610/13/2006APART
DetailsMike Jordan
john - note: insulation also - early as possible ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. East wall behind cooler, north wall at existing cmu wall. Upper portions of east wall and at octagon.
BLD-Framing/Rough-in10/12/200610/12/200610/12/2006PPASS
DetailsMike Jordan
neal; Phone #: ###-#### Internet Inspection Request from: Patricia Smith All clips were added, ok to insul.
BLD-Framing/Rough-in10/11/200610/12/200610/12/2006APART
DetailsMike Jordan
nell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. South wall ok, east wall, all clips not installed per plan at upper elev. Will remove insul and sheet rock to install clips. Needs to remove sheetrock from westwall to verify clips.
BLD-Energy code compliance10/12/200610/12/200610/12/2006APART
DetailsMike Jordan
nell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. South demissing wall at existing block wall. ok to cover.
BLD-Framing/Rough-in10/3/200610/4/200610/4/2006APART
DetailsMike Jordan
NEIL; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Exterior steel stud framing at east wall, upper tower and lower tower. Contractor to get rfi for sub of fillet welds to hilti shot pins at angle to bent plate connections.
BLD-Footing9/28/20069/29/20069/29/2006PPART
DetailsMike Jordan
neal; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Perimeter footings and grade beams. wip. Wiil have special insp.
BLD-Footing9/15/20069/15/20069/15/2006PPART
DetailsMike Jordan
neil ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Interior column pad footings.