Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-02150
StatusFinaled
Name DIMENSION BUILDING CO
Site Address 5883 E WOODCROSS DR
Project Name 
Customer Number 
ePlanReviewNo
Description
RCE-3838 DIMENSION BUILDING COMPANY To construct a 4037 sq. ft. two story single family dwelling with a 803 sq. ft. attached three car garage, a 108 sq. ft. covered concrete entry porch and a 360 sq. ft. covered wood deck at rear of structure per approved plans, all engineering, all red-lining and attached condition list. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City." (1st floor 1209 sq. ft.)(2nd floor 2828 sq. ft.) A-1 PC# 406 DJO

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/22/20084/22/20084/22/2008PPASS
DetailsMike Jordan
david - please call for access Phone #: ###-####.
DOC - Permit Finaled4/22/20084/22/20084/22/2008PPASS
DetailsMike Jordan
Letter of compliance issued. All issues resolved.
FIRE-Final Inspection4/21/20084/22/20084/22/2008ADEFR
DetailsForrest France
Wrong inspection type called in, was intended for a structural final. Noted no fire inspection signatures are required per project details, notified contact by phone to reschedule as discussed.
BLD-Final1/10/20081/10/20081/10/2008PFAIL
DetailsMike Jordan
corey - please call for access Phone #: ###-####. Provide adress. A guardail is required around driveway were grade below exceeds 30". Provide code compliant ramp or stairway at door to underfloor space.
BLD-Energy code compliance7/3/20077/3/20077/3/2007PPASS
DetailsDave Hannah
david Phone #: ###-####
BLD-Energy code compliance7/2/20077/3/20077/3/2007ANR
DetailsDave Hannah
david Phone #: ###-####
BLD-Framing/Rough-in6/29/20077/2/20077/2/2007ADONE
DetailsDave Hannah
david Phone #: ###-####
BLD-Framing/Rough-in6/26/20076/26/20076/26/2007PPASS
DetailsJim Storey
ian Phone #: ###-####
BLD-Other1/29/20071/30/20071/30/2007APASS
DetailsDave Hannah
logan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Foundation1/26/20071/26/20071/26/2007PPASS
DetailsDave Hannah
logan; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Footing1/25/20071/25/20071/25/2007PPART
DetailsDave Hannah
logan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Foundation12/22/200612/27/200612/27/2006APART
DetailsJim Storey
Logan; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
BLD-Other12/20/200612/20/200612/20/2006PCANC
DetailsDave Hannah
logan - stem wall ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Other12/14/200612/15/200612/15/2006AFAIL
DetailsDave Hannah
logan - stem wall ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith high wall not per plan need engineering
BLD-Other12/13/200612/14/200612/14/2006ACANC
DetailsDave Hannah
logan - stem wall ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Foundation12/6/200612/6/200612/6/2006PPART
DetailsMike Jordan
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Perimeter and interior footings. wip. Noted no entry on permit stating that hillside ordinance applied.