BLD-Final | 2/22/2007 | 2/23/2007 | 2/23/2007 | A | PASS |
Dave Hannah
|
|
|
gordon; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for perm occ
|
Permanent Occupancy | | 2/23/2007 | 2/23/2007 | | DONE |
|
|
|
|
BLD-Final | 2/20/2007 | 2/21/2007 | 2/21/2007 | A | FAIL |
Dave Hannah
|
|
|
gordon; Phone #: ###-#### Internet Inspection Request from: Victoria Beall egress doors donot swing in the path of egress called contractor he will talked to building owner
|
BLD-Final | 2/16/2007 | 2/20/2007 | 2/20/2007 | A | PART |
Dave Hannah
|
|
|
gordon; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for temp occ needs plumbing final
|
FIRE-Final Inspection | 2/15/2007 | 2/16/2007 | 2/16/2007 | P | PASS |
Forrest France
|
|
|
Items on previous c/n are completed with the exception of max. occupant load sign posting to be finished prior to structural final inspection. Fire life safety passed.
|
FIRE-Final Inspection | 1/26/2007 | 1/29/2007 | 1/29/2007 | A | FAIL |
Forrest France
|
|
|
Fire alarm modifications are necessary which will require a permit and inspection for approval prior to life safety final, also need to provide one PFE, repair emergency lights at the exercise room, provie approved door hardware at two locations, post max occupant load sign, provide signage above keyed locking doors.
|
BLD-Other | 1/2/2007 | 1/2/2007 | 1/2/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/2/2007 at 7:02:19 AM. Contact: ###-####. ceiling grid ok to cover in weight room
|
BLD-Framing/Rough-in | 11/22/2006 | 11/24/2006 | 11/24/2006 | A | PASS |
Dave Hannah
|
|
|
GORDON; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|