Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-02241
StatusFinaled
Name PIONEER HOMES
Site Address 8274 W TETHER ST
Project Name 
Customer Number 
ePlanReviewNo
Description
"CONTRACTOR MICHAEL TOFFT REGISTRATION NUMBER RCE-4897" To construct a 3205sq.ft. Two story single family dwelling (2837sq.ft. Main level / 368sq.ft. Upper level Bonus room) with a 36sq.ft. Covered front porch, a 130sq.ft. Covered rear patio, and a 732sq.ft. Attached garage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by the city of Boise. R-1B/DA Zoning District and Building setbacks as per Sue Hansen with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/5/200612/6/200612/6/2006APASS
DetailsMike Jordan
ben - call for access ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
DOC - Permit Finaled12/6/200612/6/200612/6/2006PPASS
DetailsMike Jordan
BLD-Energy code compliance10/3/200610/4/200610/4/2006PPASS
DetailsMike Jordan
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. All framing issues have been resolved.
BLD-Framing/Rough-in10/2/200610/3/200610/3/2006AFAIL
DetailsMike Jordan
###-####. Complete lateral bracing, A07T-A012T trusses. Min. 3 8d nails at truss connections needed. 2 ply girder trusses nailed insufficiently on bottom chords. Provide additional 2x on wall under 2ply 9.5 ML at furnace, east wall. Justify sub of 2 ply 9.5 ML for 4x8 header from garage to house. c/n posted. ok to insul.
BLD-Footing9/5/20069/5/20069/5/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/5/2006 at 7:18:18 AM. Contact: ###-####.
BLD-Footing8/25/20068/28/20068/28/2006PCANC
DetailsMike Jordan
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Canc by contractor.