BLD-Final | 7/17/2009 | 7/20/2009 | 7/20/2009 | A | PASS |
Dave Hannah
|
|
|
brad Phone #: ###-#### ok for c.c.
|
FIRE-Final Inspection | 5/1/2009 | 5/1/2009 | 5/1/2009 | P | PASS |
Forrest France
|
|
|
C/N items have been finished with the exception of signage at the elevator lobbys, relocation of stairway floor signage, and braile exit signage at the balcony. Items to be completed prior to structural final approval as discussed. Shell building fire life safety passed.
|
BLD-Final | 4/28/2009 | 4/28/2009 | 4/29/2009 | P | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-#### ok for temp occ
|
FIRE-Final Inspection | 4/27/2009 | 4/28/2009 | 4/28/2009 | A | PART |
Forrest France
|
|
|
Remaining items include #17 (10) telephone line at the fire command center, #93 elevator signage, fire alarm descriptor at the FACP for sprinkler supervision per TOC. letter item six. Some issues corrected while on site including fire stop at penetrations on the 3rd, 4th, and 9th floors, EM light repair at the 9th floor west stairway, correct hardware installed at the basement west exit door, building plan schematic provided at the command center, missing escutcheon installed at the 17th floor stairway. EM lighting and exit signage tested okay via generator power. Project related shell alarm and sprinkler permits finaled.
|
BLD-Final | 4/23/2009 | 4/24/2009 | 4/28/2009 | P | NR |
Dave Hannah
|
|
|
Brad- temp occ Phone #: ###-####
|
FIRE-Final Inspection | 4/27/2009 | 4/27/2009 | 4/27/2009 | P | PART |
Forrest France
|
|
|
Work in progress at dry sprinkler risers for the 3rd and 4th floors, phone line at the command center to be installed 4/28 per contractor, discussed remainder of items needed for fire life safety and generator test for egress lighting.
|
FIRE-Final Inspection | 4/23/2009 | 4/24/2009 | 4/24/2009 | A | FAIL |
Forrest France
|
|
|
Missing fire code review notes for on site inspection, noted item #10 per IFC sec. 509 at the fire command center has not been installed, need to coordinate EM lighting and exit signage testing via generator backup with the electrician, project related fire sprinkler permit is not yet approved for final.
|
FIRE-Final Inspection | 4/23/2009 | 4/23/2009 | 4/23/2009 | P | NR |
Forrest France
|
|
|
Building fire life safety cannot be approved until project related fire sprinkler and alarm permit work have passed final inspections. Note: Fire sprinkler failed dry system water delivery requirements at the 3rd and 4th level parking decks. Fire alarm system lacks interconnection to the exitsing structure sprinkler monitoring per conditions of the Temporary Occupancy agreement letter.
|
FIRE-Final Inspection | 4/20/2009 | 4/21/2009 | 4/21/2009 | P | NR |
Forrest France
|
|
|
brad Phone #: ###-####
|
BLD-Conference | 4/14/2009 | 4/15/2009 | 4/15/2009 | A | PASS |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
FIRE-Final Inspection | 4/13/2009 | 4/14/2009 | 4/14/2009 | P | NR |
Forrest France
|
|
|
Project related fire alarm and sprinkler permits must be approved prior to final inspection for building fire life safety.
|
FIRE-Final Inspection | 4/8/2009 | 4/9/2009 | 4/9/2009 | P | NR |
Forrest France
|
|
|
Regarding backup power source requirements.
|
BLD-Final | 4/7/2009 | 4/9/2009 | 4/9/2009 | P | CANC |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
FIRE-Hydro test above ground | 4/1/2009 | 4/1/2009 | 4/2/2009 | P | PART |
Forrest France
|
|
|
Hydrostatic retesting for the 14th floor completed, concluded satisfactory 24 hr. air test for the 3rd and 4th floor dry systems.
|
FIRE-Hydro test above ground | 3/31/2009 | 3/31/2009 | 3/31/2009 | P | PART |
Forrest France
|
|
|
Overhead hydrostatic testing for the 12th, 16th, 17th,18th and basement levels passed. NOTE: hydro test for the 14th floor failed due to 5 psi. loss at the guage. Also begin 24 hr. air testing for the 3rd and 4th floor dry systems.
|
BLD-Conference | 3/27/2009 | 3/30/2009 | 3/30/2009 | A | PASS |
Dave Hannah
|
|
|
brad Phone #: ###-####
|
FIRE-Conference | 3/28/2009 | 3/28/2009 | 3/28/2009 | A | DONE |
Scott Arellano
|
|
|
Witnessed stairwell pressurization testing by independant contractor (Romar). Test report to be compiled by contractor and delivered to fire department at final inspection.
|
BLD-Conference | 3/24/2009 | 3/24/2009 | 3/25/2009 | P | PASS |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
BLD-Conference | 3/20/2009 | 3/20/2009 | 3/23/2009 | P | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-#### walked basement with contractor has several items to fix
|
BLD-Framing/Rough-in | 3/9/2009 | 3/10/2009 | 3/10/2009 | P | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-#### elev lobbies and corr on 10 thur 17 ok to cover
|
BLD-Final | 3/3/2009 | 3/5/2009 | 3/5/2009 | A | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-#### corradors floors 9,10,and 11 ok to cover ceilings
|
BLD-Framing/Rough-in | 2/26/2009 | 3/2/2009 | 3/3/2009 | P | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### ceilings 11th floor ok to cover hard lids
|
BLD-Framing/Rough-in | 2/20/2009 | 2/23/2009 | 2/23/2009 | A | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### stairs on appt on 17th fl ok to cover
|
BLD-Framing/Rough-in | 2/19/2009 | 2/20/2009 | 2/20/2009 | A | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### ok to cover ceiling on 9th floor corr
|
BLD-Framing/Rough-in | 2/17/2009 | 2/18/2009 | 2/19/2009 | A | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### ext wall 17th and 18th floor ok to cover
|
BLD-Framing/Rough-in | 2/10/2009 | 2/11/2009 | 2/12/2009 | A | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### 7th floor corr ok to cover ceiling 3rd floor eng rm ok to cover
|
BLD-Framing/Rough-in | 2/4/2009 | 2/4/2009 | 2/4/2009 | P | PART |
Dave Hannah
|
|
|
BRAD Phone #: ###-#### ok to cover ceiling on 8th floor corrador
|
BLD-Framing/Rough-in | 2/2/2009 | 2/3/2009 | 2/3/2009 | A | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-#### ok to cover corr on 16th floor
|
BLD-Framing/Rough-in | 1/26/2009 | 1/27/2009 | 1/28/2009 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### brett
|
BLD-Framing/Rough-in | 1/23/2009 | 1/26/2009 | 1/27/2009 | P | PASS |
Dave Hannah
|
|
|
brad Phone #: ###-#### hard lids on 10th floor ok gas lines on ext walls in corr ok to cover
|
BLD-Framing/Rough-in | 1/21/2009 | 1/22/2009 | 1/22/2009 | A | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### ok to insulate 17th fl ext hallway walls and soffits on ground floor ext
|
BLD-Framing/Rough-in | 1/14/2009 | 1/15/2009 | 1/16/2009 | A | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### trash shut shaft and room on ground floor ok to cover elec bus through floors ok
|
BLD-Framing/Rough-in | 1/12/2009 | 1/13/2009 | 1/16/2009 | P | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### ext cor walls L12-14
|
BLD-Framing/Rough-in | 1/8/2009 | 1/9/2009 | 1/12/2009 | P | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### looked at elec bus work in floors need to see more of the inslation
|
BLD-Framing/Rough-in | 1/7/2009 | 1/8/2009 | 1/8/2009 | A | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### 10th floor walls ok to one side
|
BLD-Footing | 1/5/2009 | 1/6/2009 | 1/6/2009 | A | NR |
Dave Hannah
|
|
|
brad Phone #: ###-####
|
FIRE-Conference | 1/5/2009 | 1/5/2009 | 1/5/2009 | P | DONE |
Forrest France
|
|
|
Regarding project scheduling for permit finals.
|
BLD-Framing/Rough-in | 12/29/2008 | 12/30/2008 | 12/30/2008 | A | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### corr on 8,9,and 10 lev ok to cover
|
BLD-Framing/Rough-in | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | PART |
Dave Hannah
|
|
|
david - drywall Phone #: ###-#### ok to cover walls around backup genenator on L3
|
BLD-Framing/Rough-in | 12/18/2008 | 12/19/2008 | 12/19/2008 | P | PART |
Dave Hannah
|
|
|
BRAD Phone #: ###-#### 9th floor soffits ok to cover
|
BLD-Framing/Rough-in | 12/15/2008 | 12/16/2008 | 12/16/2008 | A | PART |
Dave Hannah
|
|
|
BRAD Phone #: ###-####
|
BLD-Framing/Rough-in | 12/15/2008 | 12/15/2008 | 12/16/2008 | P | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### elev fronts ok to cover
|
BLD-Framing/Rough-in | 12/8/2008 | 12/8/2008 | 12/10/2008 | P | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### ok to cover 9th floor
|
BLD-Framing/Rough-in | 12/9/2008 | 12/9/2008 | 12/10/2008 | P | PASS |
Dave Hannah
|
|
|
brad Phone #: ###-#### ok to cover 9th floor walls
|
BLD-Framing/Rough-in | 12/4/2008 | 12/4/2008 | 12/5/2008 | P | FAIL |
Dave Hannah
|
|
|
brad Phone #: ###-#### 9th floor need to fix fire protection items
|
BLD-Framing/Rough-in | 12/1/2008 | 12/2/2008 | 12/2/2008 | A | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### ok to cover 8th floor hard lids
|
BLD-Framing/Rough-in | 11/26/2008 | 12/1/2008 | 12/1/2008 | P | CANC |
Dave Hannah
|
|
|
Brad- if possible Phone #: ###-#### Inspection cancelled from web by: Patricia Smith
|
BLD-Framing/Rough-in | 11/21/2008 | 11/21/2008 | 11/22/2008 | P | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### elev shaft inner wall oklevel 5
|
BLD-Conference | 11/20/2008 | 11/20/2008 | 11/20/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/20/2008 at 9:53:42 AM. Contact: ###-####. talked about what needs to be completed to get a temp occ
|
BLD-Framing/Rough-in | 11/18/2008 | 11/19/2008 | 11/20/2008 | P | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### ok to cover walls 8th floor
|
BLD-Framing/Rough-in | 11/17/2008 | 11/18/2008 | 11/19/2008 | A | FAIL |
Dave Hannah
|
|
|
Brad Phone #: ###-#### 8th floor ok to cover one side only
|
BLD-Framing/Rough-in | 10/28/2008 | 10/29/2008 | 11/4/2008 | A | CANC |
Dave Hannah
|
|
|
brett Phone #: ###-####
|
BLD-Concrete | 10/23/2008 | 10/24/2008 | 10/28/2008 | A | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
BLD-Framing/Rough-in | 10/16/2008 | 10/16/2008 | 10/20/2008 | P | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### stair towers and elev control room on top flor ok to cover
|
BLD-Conference | 10/13/2008 | 10/13/2008 | 10/14/2008 | P | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### need two hr wall in stair tower
|
BLD-Framing/Rough-in | 10/6/2008 | 10/7/2008 | 10/7/2008 | A | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### ok to cover ceiling
|
BLD-Framing/Rough-in | 9/30/2008 | 10/1/2008 | 10/1/2008 | A | CANC |
Dave Hannah
|
|
|
brad Phone #: ###-####
|
BLD-Framing/Rough-in | 9/23/2008 | 9/23/2008 | 9/24/2008 | P | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
BLD-Framing/Rough-in | 9/18/2008 | 9/18/2008 | 9/20/2008 | P | FAIL |
Dave Hannah
|
|
|
Brad Phone #: ###-#### ceiling grid 4th floor note to code
|
BLD-Framing/Rough-in | 9/9/2008 | 9/9/2008 | 9/9/2008 | P | PART |
Dave Hannah
|
|
|
###-#### - brad soffits on 7th floor ok to cover
|
BLD-Framing/Rough-in | 9/4/2008 | 9/5/2008 | 9/8/2008 | A | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-#### ok to cover soffits on 6th floor
|
BLD-Framing/Rough-in | 9/2/2008 | 9/3/2008 | 9/3/2008 | A | PART |
Dave Hannah
|
|
|
brad - ###-#### - 5th floor ok to cover soffits
|
BLD-Framing/Rough-in | 8/28/2008 | 8/28/2008 | 8/29/2008 | P | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-#### stair towers 8th and 9th floors ok to cover
|
BLD-Framing/Rough-in | 8/25/2008 | 8/26/2008 | 8/26/2008 | A | PART |
Dave Hannah
|
|
|
brett Phone #: ###-####
|
BLD-Concrete | 8/25/2008 | 8/25/2008 | 8/25/2008 | P | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### roof deck mti on site
|
BLD-Framing/Rough-in | 8/20/2008 | 8/20/2008 | 8/21/2008 | P | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-#### 7th floor ok to cover walls
|
BLD-Framing/Rough-in | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | FAIL |
Dave Hannah
|
|
|
brad Phone #: ###-####
|
BLD-Framing/Rough-in | 8/14/2008 | 8/15/2008 | 8/15/2008 | A | NR |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
BLD-Framing/Rough-in | 8/12/2008 | 8/14/2008 | 8/15/2008 | A | PART |
Dave Hannah
|
|
|
BRAD Phone #: ###-#### ok to cover insulation on ceiling of level 4 above ac units need to fire stop wall pent on 5
|
BLD-Concrete | 8/11/2008 | 8/11/2008 | 8/11/2008 | P | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-#### mti on site to cover that concrete placement of the 18 th floor
|
BLD-Framing/Rough-in | 8/11/2008 | 8/11/2008 | 8/11/2008 | P | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-#### 6th floor ok to cover walls in condos
|
BLD-Framing/Rough-in | 8/8/2008 | 8/8/2008 | 8/11/2008 | P | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-#### pent in floor on 6th floor ok
|
BLD-Framing/Rough-in | 8/5/2008 | 8/6/2008 | 8/6/2008 | A | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-#### ok to cover walls on 5th floor
|
BLD-Concrete | 7/23/2008 | 7/24/2008 | 7/24/2008 | P | PART |
Tom Arcoraci
|
|
|
brad Phone #: ###-####
|
BLD-Framing/Rough-in | 7/21/2008 | 7/22/2008 | 7/23/2008 | P | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### need puddy pads on both side of walls
|
BLD-Framing/Rough-in | 7/16/2008 | 7/21/2008 | 7/21/2008 | A | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-#### ok to one side walls floor pent ok need to puddy pad elec boxs in party walls with less than 24inchs of sep
|
BLD-Framing/Rough-in | 7/15/2008 | 7/15/2008 | 7/16/2008 | P | NR |
Dave Hannah
|
|
|
brad Phone #: ###-#### needs to fire stop floor
|
BLD-Concrete | 7/9/2008 | 7/10/2008 | 7/14/2008 | A | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
BLD-Framing/Rough-in | 7/9/2008 | 7/9/2008 | 7/9/2008 | A | PART |
Dave Hannah
|
|
|
second floor restrooms ok to cover
|
BLD-Framing/Rough-in | 6/27/2008 | 6/30/2008 | 7/1/2008 | A | NR |
Dave Hannah
|
|
|
Dave- Floors 5 and 6 Phone #: ###-####
|
BLD-Framing/Rough-in | 6/25/2008 | 6/25/2008 | 6/26/2008 | P | PART |
Dave Hannah
|
|
|
Brad Phone #: ###-#### fire proofing between buildings ok to keep going
|
BLD-Concrete | 6/16/2008 | 6/17/2008 | 6/17/2008 | A | PART |
Dave Hannah
|
|
|
brad - ###-#### - 15th floor
|
BLD-Framing/Rough-in | 6/17/2008 | 6/17/2008 | 6/17/2008 | A | PART |
Dave Hannah
|
|
|
brad - ###-#### - close up inspection ext walls by stair towers floors 4-8
|
BLD-Other | 6/13/2008 | 6/16/2008 | 6/17/2008 | P | NR |
Dave Hannah
|
|
|
brad - ###-#### - close up inspection
|
BLD-Other | 6/13/2008 | 6/13/2008 | 6/16/2008 | P | PART |
Dave Hannah
|
|
|
brad - ###-#### - close up inspection stair tower sheetrock floors 0-5 ok for second layer
|
BLD-Concrete | 6/5/2008 | 6/5/2008 | 6/11/2008 | P | PART |
Dave Hannah
|
|
|
brad - ###-#### - 14th floor
|
BLD-Final | 6/10/2008 | 6/10/2008 | 6/10/2008 | P | PASS |
Dave Hannah
|
|
|
brad - ###-#### - 14th floor
|
BLD-Concrete | 6/4/2008 | 6/5/2008 | 6/6/2008 | A | PASS |
Dave Hannah
|
|
|
brad - ###-#### - 14th floor
|
BLD-Energy code compliance | 5/30/2008 | 6/2/2008 | 6/2/2008 | A | PART |
Dave Hannah
|
|
|
###-#### - brad walls between ext garage and new bld levels 5 6 and 7 insulation ok ok to cover walls still need to check areas that will furred out around piping
|
BLD-Framing/Rough-in | 5/27/2008 | 5/28/2008 | 5/28/2008 | A | PART |
Dave Hannah
|
|
|
###-#### - dave ok to start covering stair towers floors 1 thru 6 and wall between garage and res 6th thru 1
|
BLD-Framing/Rough-in | 5/23/2008 | 5/27/2008 | 5/27/2008 | P | CANC |
Tom Arcoraci
|
|
|
###-#### david
|
BLD-Concrete | 5/23/2008 | 5/27/2008 | 5/27/2008 | P | PASS |
Tom Arcoraci
|
|
|
david ###-####
|
BLD-Concrete | 5/9/2008 | 5/12/2008 | 5/12/2008 | A | PART |
Dave Hannah
|
|
|
dave Phone #: ###-#### 11th floor mti on site ok deck to place concrete
|
BLD-Conference | 5/2/2008 | 5/2/2008 | 5/5/2008 | P | PASS |
Dave Hannah
|
|
|
david Phone #: ###-####
|
BLD-Other | 5/2/2008 | 5/2/2008 | 5/5/2008 | P | PASS |
Dave Hannah
|
|
|
david Note: also wall Phone #: ###-####
|
BLD-Concrete | 4/14/2008 | 4/15/2008 | 4/15/2008 | A | PART |
Dave Hannah
|
|
|
brad Phone #: ###-#### placing 10th floor
|
BLD-Concrete | 4/4/2008 | 4/7/2008 | 4/7/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/4/2008 at 12:58:57 PM. Contact: ###-####. 9th floor
|
BLD-Concrete | 3/27/2008 | 3/28/2008 | 3/28/2008 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/27/2008 at 6:58:18 AM. Contact: ###-####.placed with si observation.
|
BLD-Concrete | 3/6/2008 | 3/6/2008 | 3/6/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/6/2008 at 8:00:01 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/3/2008 | 3/3/2008 | 3/3/2008 | P | PART |
Dave Hannah
|
|
|
dave - for basement Phone #: ###-#### ok to cover walls in basement
|
BLD-Concrete | 2/25/2008 | 2/25/2008 | 2/25/2008 | P | PART |
Dave Hannah
|
|
|
brad Phone #: ###-####
|
BLD-Concrete | 2/11/2008 | 2/12/2008 | 2/12/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/11/2008 at 5:08:19 PM. Contact: ###-####.
|
BLD-Conference | 1/28/2008 | 1/29/2008 | 1/30/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/28/2008 at 12:14:45 PM. Contact: ###-####. pt deck third floor
|
BLD-Concrete | 1/10/2008 | 1/11/2008 | 1/11/2008 | P | PART |
Jim Storey
|
|
|
brad Phone #: ###-####wip/first floor pt si pending reports.
|
BLD-Conference | 1/2/2008 | 1/2/2008 | 1/4/2008 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/31/2007 at 4:14:32 PM.
|
BLD-Concrete | 12/31/2007 | 1/2/2008 | 1/2/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/31/2007 at 4:14:32 PM.
|
BLD-Concrete | 12/19/2007 | 12/20/2007 | 12/21/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/19/2007 at 3:14:52 PM. Contact: ###-####.
|
BLD-Foundation | 12/11/2007 | 12/11/2007 | 12/12/2007 | P | PART |
Dave Hannah
|
|
|
david Phone #: ###-####
|
BLD-Foundation | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | PART |
Dave Hannah
|
|
|
brad Phone #: ###-####
|
BLD-Foundation | 12/3/2007 | 12/4/2007 | 12/4/2007 | A | DEFR |
Dave Hannah
|
|
|
brad Phone #: ###-####
|
BLD-Foundation | 11/29/2007 | 11/30/2007 | 11/30/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/29/2007 at 3:13:41 PM. Contact: ###-####.
|
BLD-Foundation | 11/26/2007 | 11/26/2007 | 11/27/2007 | P | PART |
Dave Hannah
|
|
|
David Grant Phone #: ###-#### on site crew still installing column steel MTI on site they will be back tomorrow to do a final inspection befor placement also the project engineer will be on site to approve before concrete placement
|
BLD-Foundation | 11/13/2007 | 11/13/2007 | 11/14/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/13/2007 at 9:41:15 AM. Contact: ###-####. mti on site for spec inpection
|
BLD-Concrete | 11/1/2007 | 11/1/2007 | 11/2/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/1/2007 at 7:50:04 AM. Contact: ###-####. footing sw corner ok to pour
|
BLD-Foundation | 10/12/2007 | 10/15/2007 | 10/16/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/12/2007 at 1:22:14 PM. Contact: ###-####.
|
BLD-Foundation | 9/20/2007 | 9/21/2007 | 9/24/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/20/2007 at 10:18:03 AM. Contact: ###-####. shot crete
|
BLD-Conference | 8/31/2007 | 9/4/2007 | 9/5/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/31/2007 at 10:23:46 AM. Contact: ###-####.
|
BLD-Foundation | 8/31/2007 | 9/4/2007 | 9/5/2007 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/31/2007 at 10:22:08 AM. Contact: ###-####. pre con meeting on concrete
|
BLD-Foundation | 8/24/2007 | 8/27/2007 | 8/27/2007 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/24/2007 at 11:44:17 AM. Contact: ###-####. spec insp required
|
BLD-Conference | 7/17/2007 | 7/18/2007 | 7/18/2007 | A | PASS |
Dave Hannah
|
|
|
###-#### david
|