BLD-Final | 4/10/2007 | 4/10/2007 | 4/10/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/10/2007 at 11:06:33 AM. Contact: ###-####. ok for perm occ. ele. Needs to final permit on computer, card was signed.
|
Permanent Occupancy | | 4/10/2007 | 4/10/2007 | | DONE |
|
|
|
|
BLD-Final | 4/6/2007 | 4/6/2007 | 4/6/2007 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/6/2007 at 11:30:05 AM. Contact: ###-####.
|
FIRE-Final Inspection | 3/8/2007 | 3/8/2007 | 3/8/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 3/8/2007 | 3/8/2007 | 3/8/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/8/2007 at 6:53:38 AM. Contact: ###-####. ok temp for temp.
|
BLD-Final | 3/7/2007 | 3/7/2007 | 3/7/2007 | P | NR |
Mike Jordan
|
|
|
|
BLD-Final | 3/7/2007 | 3/7/2007 | 3/7/2007 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/7/2007 at 7:30:15 AM. Contact: ###-####. Still needs other trades.
|
FIRE-Final Inspection | 3/7/2007 | 3/7/2007 | 3/7/2007 | A | CANC |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 3/7/2007 at 7:19:50 AM. Contact: ###-####.
|
FIRE-Final Inspection | 3/6/2007 | 3/6/2007 | 3/6/2007 | P | CANC |
Troy Cobbley
|
|
|
waiting on fire alarm
|
FIRE-Final Inspection | 3/5/2007 | 3/5/2007 | 3/5/2007 | P | CANC |
Troy Cobbley
|
|
|
Fire alarm is not ready yet. No inspection was performed.
|
FIRE-Final Inspection | 3/1/2007 | 3/1/2007 | 3/2/2007 | P | FAIL |
Troy Cobbley
|
|
|
Need fire alarm and fire sprinkler signed off first. No inspection performed.
|
FIRE-Final Inspection | 3/1/2007 | 3/2/2007 | 3/2/2007 | A | FAIL |
Troy Cobbley
|
|
|
Need to get the sprinkler permit and fire alarm permits finaled first. No inspection performed.
|
BLD-Other | 2/9/2007 | 2/9/2007 | 2/9/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/9/2007 at 10:56:32 AM. Contact: ###-####. Ceiling grid. ok.
|
BLD-Energy code compliance | 12/12/2006 | 12/12/2006 | 12/12/2006 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/12/2006 at 7:34:28 AM. Contact: ###-####. Fireblocking done.
|
BLD-Energy code compliance | 12/5/2006 | 12/5/2006 | 12/5/2006 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/5/2006 at 10:11:28 AM. Contact: ###-####. 1st floor interior and exterior walls, firestop not done. Will verify at grid insp.
|
BLD-Framing/Rough-in | 12/1/2006 | 12/1/2006 | 12/1/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/1/2006 at 9:01:00 AM. Contact: ###-####. Interior framed walls.
|