BLD-Final | 5/22/2007 | 5/22/2007 | 5/22/2007 | P | PASS |
Mike Jordan
|
|
|
rich; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Ok for perm occ. All issues resolved.
|
Permanent Occupancy | | 5/22/2007 | 5/22/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 3/22/2007 | 3/23/2007 | 3/23/2007 | P | PART |
Mike Jordan
|
|
|
rich ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Temp. occ. granted. Needs to post HC signs and finish installing grab bars in restrooms. Replace door hardware on janitors closet to lever type. All ceiling grid issues have been resolved and is ok to cover.
|
FIRE-Final Inspection | 3/23/2007 | 3/23/2007 | 3/23/2007 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave hannimans permission until items as noted by mike timmermans inspection have been corrected for the fire alarm and suppression permits. Also the battery containment issues needs addressed.
|
BLD-Other | 3/21/2007 | 3/21/2007 | 3/21/2007 | P | FAIL |
Mike Jordan
|
|
|
Rich Ceiling ; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Tile already in place. Noted upon further insp. that additional wires needed for diffusers, etc... Also needs rto remove wall angle used to attach runners and used approved connectors.
|
Code Occupancy Approval | 3/19/2007 | 3/19/2007 | 3/20/2007 | P | PASS |
Carol Montgomery
|
|
|
Meets compliance (insp. on 3-19-2007)
|
Code Occupancy Approval | 3/14/2007 | 3/16/2007 | 3/19/2007 | A | CANC |
Carol Montgomery
|
|
|
Rich called at approx. 4:00pm- NR
|
Code Occupancy Approval | 3/13/2007 | 3/13/2007 | 3/14/2007 | P | CANC |
Carol Montgomery
|
|
|
Called Rich. They have landscape in and fence posts up. Fence is not completed - so, they are not ready for inspection - schedule inspection for Friday (3-16-2007)
|
FIRE-Final Inspection | 2/22/2007 | 2/22/2007 | 2/22/2007 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was not for a final but for a cover inspection on part of the sprinkler piping. The sprinkler piping in the areas outside of the pre-action system areas are ok to cover.
|
BLD-Framing/Rough-in | 2/9/2007 | 2/9/2007 | 2/9/2007 | P | PASS |
Mike Jordan
|
|
|
rich; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. On site to inspect truss penetration repair at 1hr fire barrier wall around battery room. All modifications were done in accordance with plans approved by G. Slane
|
BLD-Framing/Rough-in | 11/27/2006 | 11/28/2006 | 11/28/2006 | A | FAIL |
Mike Jordan
|
|
|
richard; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Wood truss and wood beam penetrations not allowed at 1hr fire barrier wall. Architect to provide UL approved listed assembly for wood truss and wood beam penetrations or provide detail to plan review for approval for aequate protection.
|