BLD-Final | 4/11/2007 | 4/12/2007 | 4/12/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/11/2007 at 11:14:49 AM. Contact: ###-####. Final ok. All issues resolved.
|
Permanent Occupancy | | 4/12/2007 | 4/12/2007 | | DONE |
|
|
|
|
BLD-Final | 4/6/2007 | 4/10/2007 | 4/10/2007 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/6/2007 at 11:30:44 AM. Contact: ###-####. Needs to install max. occ. load sign (70). Also needs to instal smoke seal on new 20 min door out of reception area into 1hr. corridor.
|
FIRE-Final Inspection | 4/9/2007 | 4/10/2007 | 4/10/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 4/6/2007 | 4/9/2007 | 4/9/2007 | P | FAIL |
Troy Cobbley
|
|
|
Three exit lights did not operate on battery backup.
|
BLD-Final | 2/21/2007 | 2/22/2007 | 2/22/2007 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/21/2007 at 12:53:04 PM. Contact: ###-####. Called and spoke with Collin (gen contr) and noted to him that he still needed otrher trades finaled prior to bldg. final.
|
BLD-Other | 2/1/2007 | 2/2/2007 | 2/2/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/1/2007 at 2:09:55 PM. Contact: ###-####. Reinspection of ceiling grid. grid ok. Phase 1 work.
|
BLD-Other | 2/1/2007 | 2/1/2007 | 2/1/2007 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/1/2007 at 7:58:01 AM. Contact: ###-####. ceiling grid. New grid installed was floating system, Needs to comply with 94 UBC standard 25. systems can not be mixed and matched.
|
BLD-Framing/Rough-in | 1/18/2007 | 1/19/2007 | 1/19/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/18/2007 at 11:47:52 AM. Contact: ###-####. Phase 1 interior non load bearing walls.
|