BLD-Final | 2/28/2007 | 3/1/2007 | 3/1/2007 | P | PASS |
Dave Hannah
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
DOC - Permit Finaled | 3/1/2007 | 3/1/2007 | 3/1/2007 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 3/1/2007 | 3/1/2007 | 3/1/2007 | P | PASS |
Forrest France
|
|
|
Duplicate entry, inspection passed.
|
FIRE-Final Inspection | 2/23/2007 | 2/26/2007 | 3/1/2007 | A | PASS |
Forrest France
|
|
|
Fire life safety passed inspection, noted two covers at SD to be removed after const. cleaning is finished and prior to occupancy, contractor also agreed to remove locking hasp at the door to the mech. room while on site.
|
BLD-Final | 2/23/2007 | 2/26/2007 | 2/26/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/23/2007 at 7:31:19 PM. Contact: ###-####.ok for perm occ after other trades go perm
|
BLD-Other | 1/18/2007 | 1/18/2007 | 1/19/2007 | P | PASS |
Dave Hannah
|
|
|
This is for a ceiling inspection. Please contact Greg Bolton @ ###-####. Thank you Phone #: ###-####
|
BLD-Framing/Rough-in | 12/13/2006 | 12/14/2006 | 12/14/2006 | A | DONE |
Dave Hannah
|
|
|
Please contact Greg Bolton prior to going out at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
|
BLD-Framing/Rough-in | 12/14/2006 | 12/14/2006 | 12/14/2006 | P | PASS |
Dave Hannah
|
|
|
Please contact Greg Bolton prior to going out at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
|
BLD-Framing/Rough-in | 12/6/2006 | 12/7/2006 | 12/7/2006 | A | PART |
Jim Sly
|
|
|
Please contact Greg Bolton at ###-####, prior to going out. Thank You; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson Walls not per appr plan........Resubmitted plan in plan check for approval.....Contr wants to 1side walls.....OK , but on his own..... do not proceed beyond this until plans appr, and frame insp completed.
|