Permit Information
Permit NumberBLD06-02700
StatusFinaled
Name STATEHOUSE INN
Site Address 981 W GROVE ST
Project NameSTATEHOUSE INN
Customer Number 
ePlanReviewNo
Description
(STATEHOUSE INN - REMODEL ON FLRS 2, 3, 4, & 5) ** PLAN MODIFICATION, 3/30/07. ADDING REMODEL OF ROOM SUITE 516 AS PART OF THIS PERMIT. PERFORM SELECT INTERIOR DEMOLITION TO PREPARE FOR NEW FULLY ACCESSIBLE RESTROOM, BATH AND ACCESSIBLE ROUTE WITHIN SUITE 516. CONSTRUCT NON-COMBUSTIBLE WALLS TO SEPARATE THE RESTROOM / BATH FROM SLEEPING AREA; REPAIR & MAINTAIN 2-HOUR OCCUPANCY SEPARATION WALL BETWEEN NEW RESTROOM /BATH AND MECHANICAL ROOM WITH ALL PENETRATIONS PROTECTED BY APPROVED FIRESTOP ASSEMBLIES; MAINTAIN INTEGRITY OF TWO HOUR CONCRETE FLOOR ABOVE AND BELOW THIS UNIT; INSTALL NEW FINISHES. REMAINING SCOPE OF WORK TO BE AS ORIGINALLY APPROVED.** To replace the suspended ceiling system and lighting fixture's in the existing corridors on the 2nd, 3rd, 4th & 5th floors of the Statehouse Inn. Each area of remodel is 1,724 sq. feet in area, serving the guest rooms on each level. The required exit system (1-hour rated exit corridor & 2 exit enclosure stairways) serving each floor shall be maintained usable at all times. Corridors shall not be used for staging area. Ceiling & lighting components that are demolished shall be removed from the area of demolition as it is removed. The existing sprinkler and alarm systems shall be maintained at all times or as otherwise approved by the Boise City Fire Department. DO NOT ALTER OR TURN OFF the sprinkler and or alarm systems without prior approval by the fire department. A Letter of Compliance is required for final of this permit. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/20/20077/20/20077/20/2007PPASS
DetailsDave Hannah
barak - please call 1/2 hr prior to inspection Phone #: ###-####
DOC - Permit Finaled7/20/20077/20/20077/20/2007PPASS
DetailsDave Hannah
FIRE-Final Inspection7/19/20077/20/20077/20/2007APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection7/5/20077/5/20077/5/2007PFAIL
DetailsForrest France
Emergency light at the elevator lobby 5th floor failed to function, one fire door at the 3rd floor west side atrium pair failed to close on general alarm, exit sign at the 2nd floor east side does not illuminate on power fail.
FIRE-Sprinkler Rough-in7/5/20077/5/20077/5/2007PPASS
DetailsForrest France
Required corrections for the corridor fire sprinklers on the 2nd, 3rd, 4th, and 5th levels completed satisfactory.
FIRE-Final Inspection5/23/20075/23/20075/23/2007PFAIL
DetailsForrest France
Missing escutcheons at fire sprinkler heads at various locations in the corridors, some heads are in need of adjustment as the deflector is above or even with the ceiling tile, need to repair emergency lighting at several locations, missing a/v fire alarm notification for ADA room 516.
FIRE-Sprinkler Rough-in5/22/20075/23/20075/23/2007PCANC
DetailsForrest France
barak ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in4/17/20074/18/20074/18/2007PPASS
DetailsDave Hannah
gordon; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover bathroom
BLD-Framing/Rough-in4/12/20074/13/20074/13/2007AFAIL
DetailsDave Hannah
gordon ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith remove sheet rock from ceiling fire stop all pent in walls and floor criling
BLD-Other2/8/20072/8/20072/8/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/8/2007 at 7:26:06 AM. Contact: ###-####. 4th floor ceiling
BLD-Other1/17/20071/18/20071/18/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/15/2007 at 6:37:35 AM. Contact: ###-####.grid ok but need to patch up holes in corr wall
BLD-Other1/16/20071/17/20071/17/2007ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/15/2007 at 6:37:35 AM. Contact: ###-####.
BLD-Other1/15/20071/16/20071/16/2007ADEFR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/15/2007 at 6:37:35 AM. Contact: ###-####.
BLD-Other12/1/200612/4/200612/4/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/1/2006 at 10:48:05 AM. Contact: ###-####. third floor ceiling grid ok tocover after all other trades ok
BLD-Other11/20/200611/20/200611/20/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/20/2006 at 9:07:29 AM. Contact: ###-####.second flr ceiling grid souyh half ok