Permit Information
Permit NumberBLD06-02716
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 251 E FRONT ST Unit: 200
Project NameONE FRONT ST-2ND FLR
Customer Number 
ePlanReviewNo
Description
(Kreizenbeck Constructors RCE-764) (SPINK BUTLER EXPANSION - ONE FRONT STREET - 2ND FLR) To remodel an existing office by expanding into an additional 1,405 sq.ft. of vacant area which changes the office tenant space from 5,018 to 6,423 sq.ft. per approved plans. Work to include, selective interior demolition, construction of new interior noncombustible partitions, installation of new suspended ceiling and related lighting, installation of new HVAC ducting, miscellaneous related interior finishes. This building is fully fire sprinklered any alterations or modifications to the sprinkler system shall be installed per NFPA #13 as regulated by the fire department. RMH (PLAN MODIFICATION / 12/20/06 ) TO ADD AN ADDITIONAL 227 SQ FT OFFICE TO TENANT SPACE TO BRING THE TOTAL TENANT SPACE AREA TO 6650 SQ FT. RMH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/2/20072/5/20072/5/2007PPASS
DetailsDave Hannah
erin; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for perm occ
FIRE-Final Inspection2/2/20072/5/20072/5/2007APASS
DetailsForrest France
Correction notice items verified for compliance, fire life safety inspection passed.
Permanent Occupancy 2/5/20072/5/2007 DONE
Details
FIRE-Final Inspection2/1/20072/1/20072/2/2007PFAIL
DetailsForrest France
Need to repair the two exit signs at hall 227 which are not functional on battery backup.
BLD-Final2/1/20072/2/20072/2/2007PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/1/2007 at 10:57:17 AM. Contact: ###-####.
BLD-Wall cover12/26/200612/27/200612/27/2006APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/26/2006 at 4:09:24 PM. Contact: ###-####.