Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-02785
StatusFinaled
Name OLD SPAGHETTI FACTORY - SHELL
Site Address 610 W IDAHO ST
Project NameOLD SPAGHETTI FACTORY
Customer Number 
ePlanReviewNo
Description
(RCE-1066 RSCI) (OLD SPAGHETTI FACTORY - SHELL) This building will be fire sprinklered for area increase under the tenant improvement permit. To alter an existing 10,584 square foot building for a future restaurant tenant. This permit is for shell work only and does NOT establish a Certificate of Occupancy. Work is to include a seismic upgrade (concrete shear walls and roof ties to perimeter walls), alterations to the roof structure (new beams, joists, columns, concrete footings), new wall openings (steel headers and columns), a new concrete slab on grade, fixed awnings, and new exterior windows and doors. A 428 square foot basement will be abandoned. A floor will be constructed over the stairway access and the existing floor will be strengthened. The tenant improvement work will be done under permit BLD06-02665. Interior non-structural demolition was done under permit BLD06-03204. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. DRH06-00273 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/22/20075/23/20075/23/2007APASS
DetailsDave Hannah
steve - late morning please ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in5/22/20075/22/20075/22/2007PCANC
DetailsDave Hannah
BLD-Final5/21/20075/21/20075/21/2007PFAIL
DetailsDave Hannah
steve ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith needs other signoffs
FIRE-Final Inspection5/21/20075/21/20075/21/2007PPASS
DetailsForrest France
Shell life safety passed.
BLD-Framing/Rough-in4/26/20074/27/20074/30/2007AFAIL
DetailsDave Hannah
steve - ceiling grid for kitchen area ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith needs elec r/i wire up lights ect
BLD-Framing/Rough-in4/25/20074/26/20074/26/2007ANR
DetailsDave Hannah
steve - ceiling grid for kitchen area ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith needs elec final
BLD-Framing/Rough-in3/21/20073/22/20073/22/2007APART
DetailsDave Hannah
Steve mid morning if possible; Phone #: ###-#### Internet Inspection Request from: Stacie Backus insulation ok in extb walls ok to cover
BLD-Framing/Rough-in3/19/20073/20/20073/20/2007APART
DetailsDave Hannah
steve ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover int wallc and soffits
BLD-Framing/Rough-in3/12/20073/13/20073/14/2007ACANC
DetailsJim Storey
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in3/1/20073/2/20073/2/2007APART
DetailsJim Sly
Steve; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
OK to cover Kitchen area ....and area North of Kitchen.
BLD-Framing/Rough-in2/20/20072/20/20072/20/2007PFAIL
DetailsDave Hannah
steve ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith needs other trades to sign off need to resubmit insulation plans no inspection done
BLD-Other1/10/20071/11/20071/12/2007APART
DetailsDave Hannah
steve - rebar ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith shear walls along front of bld ok to pour after mti spec inspection is oked
BLD-Framing/Rough-in12/27/200612/28/200612/29/2006APART
DetailsDave Hannah
TIM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles wall on roof area back of bld needs fire blking
BLD-Footing12/7/200612/7/200612/7/2006PPART
DetailsDave Hannah
Steve or Tim; Phone #: ###-#### or ###-#### Internet Inspection Request from: Cathy Weisshaupt column and shear wall ftgs ok will have mti do spec inspection