BLD-Final | 7/16/2007 | 7/17/2007 | 7/17/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/16/2007 at 4:47:38 PM. Contact: ###-####.
|
DOC - Permit Finaled | 7/17/2007 | 7/17/2007 | 7/17/2007 | P | PASS |
Mike Jordan
|
|
|
All required signatyres on card. Letter of compliance issued.
|
Code Occupancy Approval | 7/13/2007 | 7/13/2007 | 7/13/2007 | P | PASS |
Scott M.Brown
|
|
|
ALL IN AS REQUIRED FINAL SIGNED
|
FIRE-Final Inspection | 7/12/2007 | 7/13/2007 | 7/13/2007 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Other | 6/19/2007 | 6/20/2007 | 6/20/2007 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/19/2007 at 3:49:23 PM. Contact: ###-####. ceiling grid.
|
BLD-Energy code compliance | 6/4/2007 | 6/4/2007 | 6/4/2007 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 6/1/2007 | 6/4/2007 | 6/4/2007 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 5/31/2007 | 6/1/2007 | 6/1/2007 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/31/2007 at 11:52:40 AM. Contact: ###-####. ok to one side.
|
BLD-Framing/Rough-in | 4/9/2007 | 4/10/2007 | 4/10/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/9/2007 at 1:13:07 PM. Contact: ###-####. pre-engineered bldg. Needs special insp. on bolting.
|
BLD-Foundation | 2/16/2007 | 2/16/2007 | 2/16/2007 | P | FAIL |
Mike Jordan
|
|
|
###-#### jason. Perimeter stemwalls. Vert. reinforcement for pedestals not installed. Contractor to get RFI from structural engineer for depth on dowells and have special insp. for epoxy of missing verts. Also will need to install #4 ties at 6 inches on center as per approved plan.
|
BLD-Footing | 2/13/2007 | 2/14/2007 | 2/14/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/13/2007 at 11:42:37 AM. Contact: ###-####. Perimeter footing. Noted clearance issues and rebar not tied sufficiently. Special insp. to verify compliance. Contractor is having surveyor double check elev.
|