BLD-Final | 6/18/2007 | 6/19/2007 | 6/21/2007 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/18/2007 at 4:21:14 PM. Contact: ###-####.
|
BLD-Final | 6/20/2007 | 6/21/2007 | 6/21/2007 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/20/2007 at 1:46:05 PM. final ok
|
FIRE-Final Inspection | 6/20/2007 | 6/21/2007 | 6/21/2007 | A | PASS |
Forrest France
|
|
|
Corrections completed, fire life safety inspection passed.
|
Permanent Occupancy | | 6/21/2007 | 6/21/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/19/2007 | 6/20/2007 | 6/20/2007 | A | FAIL |
Forrest France
|
|
|
Need to provide one fire extinguisher for each floor level with current certification tag.
|
BLD-Energy code compliance | 3/29/2007 | 3/30/2007 | 3/30/2007 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/29/2007 at 3:36:01 PM. Contact: ###-####.
|
BLD-Energy code compliance | 3/20/2007 | 3/21/2007 | 3/21/2007 | P | CANC |
Jim Storey
|
|
|
Disp set to [CANC] by a contractor via Hello! on Mar 21 2007 10:52AM.
|
BLD-Energy code compliance | 3/19/2007 | 3/20/2007 | 3/20/2007 | P | DEFR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/19/2007 at 2:28:14 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/19/2007 | 3/20/2007 | 3/20/2007 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/19/2007 at 2:27:18 PM. Contact: ###-####.
|