BLD-Final | 1/19/2007 | 1/22/2007 | 1/22/2007 | A | PASS |
Mike Jordan
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
DOC - Permit Finaled | 1/22/2007 | 1/22/2007 | 1/22/2007 | P | PASS |
Mike Jordan
|
|
|
Verified that nonelec. work was done. Letter of compliance issued. final ok.
|
FIRE-Final Inspection | 1/19/2007 | 1/22/2007 | 1/22/2007 | A | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
BLD-Framing/Rough-in | 1/16/2007 | 1/17/2007 | 1/17/2007 | A | PASS |
Mike Jordan
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 12/21/2006 | 12/22/2006 | 12/22/2006 | P | PASS |
Tom Arcoraci
|
|
|
Don; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
|
BLD-Framing/Rough-in | 12/15/2006 | 12/15/2006 | 12/15/2006 | P | PART |
Mike Jordan
|
|
|
Don; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett. Inspected framing for 2hr wall infill and seperation walls in canopy. Noted that wood penetrations into fire walls are being allowed as per George Slane in canopy area with the addition of additional sprinkler heads in canopy.
|
BLD-Conference | 12/5/2006 | 12/6/2006 | 12/6/2006 | A | FAIL |
Mike Jordan
|
|
|
don ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Issued C/N to contractor noting architect to provide approved thruogh penetration listing for wood penetrations on firewalls in canopy sections as per sec. 712.3 ( Must meet requirements of ASTM E119 and E814.) Details to be submitted and approved by plan reveiw.
|
FIRE-Conference | 12/4/2006 | 12/4/2006 | 12/4/2006 | P | DONE |
Troy Cobbley
|
|
|
Don and I went over requirements for the final inspection. I told him a fire sprinkler contractor needs to verify correct sprinkler coverage on either side of the new walls in the canopy.
|
BLD-Conference | 12/4/2006 | 12/4/2006 | 12/4/2006 | P | PART |
Mike Jordan
|
|
|
don ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Reviewed approved plans. Contractor to get additional details for 2hr. wall in canopy and for infill wall. Noted that their will be existing 2x6 rafter penetrations in rated walls in canopy.
|