BLD-Final | 11/29/2007 | 11/30/2007 | 11/30/2007 | A | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-####
|
FIRE-Final Inspection | 11/30/2007 | 11/30/2007 | 11/30/2007 | P | PASS |
Forrest France
|
|
|
Corrections have been verified for compliance, fire life safety finaled.
|
FIRE-Final Inspection | 11/30/2007 | 11/30/2007 | 11/30/2007 | A | PEND |
Forrest France
|
|
|
|
FIRE-Final Inspection | 11/29/2007 | 11/29/2007 | 11/29/2007 | P | NR |
Forrest France
|
|
|
|
FIRE-Final Inspection | 11/27/2007 | 11/28/2007 | 11/28/2007 | A | FAIL |
Forrest France
|
|
|
Missing required fire extinguishers at the cleanroom area, one wall mounted av needs to be reinstalled, need project related fire alarm permit final. EM lighting and exit signs tested acceptable, remainder of fire life safety items are satisfactory.
|
FIRE-Final Inspection | 11/13/2007 | 11/13/2007 | 11/14/2007 | P | NR |
Forrest France
|
|
|
Brian; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
Code Occupancy Approval | 10/24/2007 | 10/24/2007 | 10/24/2007 | P | PASS |
Michael Garner
|
|
|
site inspection complete - I found the landscaping and parking lot in compliance with approved plans/conditions of approval - PASS
|
FIRE-Final Inspection | 10/23/2007 | 10/23/2007 | 10/23/2007 | P | NR |
Forrest France
|
|
|
Need project related fire alarm and fire sprinkler permits finaled prior to building life safety final.
|
FIRE-Conference | 9/11/2007 | 9/12/2007 | 9/12/2007 | A | DONE |
Forrest France
|
|
|
On site conference regarding first floor life safety including fire alarm and sprinkler work for the first floor office area only.
|
BLD-Final | 9/11/2007 | 9/12/2007 | 9/12/2007 | A | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-#### temp occ. aproved for use of office ( b occupancies ) all sign offs are complet and all life saftey code compliance has been achived.
|
BLD-Framing/Rough-in | 9/6/2007 | 9/7/2007 | 9/11/2007 | A | PART |
Jim Storey
|
|
|
brian Phone #: ###-#### set up tenp occ card for sign off to occupy b office area. all good pending fires inspection and aproval.
|
Code Occupancy Approval Temp | | | 8/30/2007 | | DONE |
|
|
|
Temp occ approved based on the submission of a $128 bond by McAlvain Construction for extensive landscaping and parking lot striping, to be completed on or before 11/1/07. The actual work is priced at $115,000, with a 10% fee.
The building will be used by techs only thru 11/1 with no actual occupancy until after the first of Dec.
|
FIRE-Final Inspection | 8/29/2007 | 8/29/2007 | 8/29/2007 | P | CANC |
Troy Cobbley
|
|
|
Due to the abundance of inspections today there was not adequate time to perform this one. It will need to be rescheduled.
|
BLD-Aging Inspection | 6/15/2007 | 6/15/2007 | 6/22/2007 | | PASS |
Jim Storey
|
|
|
wip
|