Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD06-03110
StatusFinaled
Name DAVE MILLER CONSTRUCTION
Site Address 701 E MORRISON KNUDSEN DR
Project NameMK PLAZA II-1ST FLR
Customer Number 
ePlanReviewNo
Description
DAVE MILLER CONST RCE #140 (HEALTH MANAGEMENT SYSTEMS - MK PLAZA II - 1ST STORY - NORTHWEST CORNER) This building is NOT fire sprinklered. To create a 7,233 square foot office tenant space on the first story of a 4 story building. Work is to include interior nonbearing walls, a new 90 minute door into an existing 2-hr fire-resistance-rated passageway, suspended ceilings, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/6/20074/9/20074/9/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/6/2007 at 2:15:24 PM. Contact: ###-####. ok for perm occ
Permanent Occupancy 4/9/20074/9/2007 DONE
Details
BLD-Final3/28/20073/29/20073/29/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/28/2007 at 1:22:49 PM. Contact: ###-####. ok for temp occ ok for perm occ after elec gos perm
FIRE-Final Inspection3/20/20073/21/20073/21/2007PPASS
DetailsTroy Cobbley
life safety passed
BLD-Other2/19/20072/20/20072/20/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/19/2007 at 2:35:45 PM. Contact: ###-####. ok to cover ceiling
BLD-Other2/15/20072/16/20072/16/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/15/2007 at 12:25:39 PM. Contact: ###-####. ok to cover ceiling c/n issued need to remove paper backed insulation and repair fire blocking at curtain wall
BLD-Framing/Rough-in1/15/20071/16/20071/16/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/15/2007 at 1:29:13 PM. Contact: ###-####. framing ok need to address fire pannel and heater box in 2hr wall as well as penatrations.