BLD-Final | 10/27/2009 | 10/27/2009 | 10/27/2009 | P | PASS |
Jim Sly
|
|
|
###-#### - tony units A & D........ All four units inspected and passed. Four unit Building passed. OK for Perm. Occ.
|
BLD-Final | 8/18/2009 | 8/18/2009 | 8/18/2009 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/18/2009 at 10:53:40 AM. Contact: ###-####. OK for Temp Occ. Unit 14C 2858 N. Cloverdale.
|
BLD-Final | 1/17/2009 | 1/20/2009 | 1/20/2009 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/17/2009 at 9:27:50 AM. Contact: ###-####. OK for temp occ on unit 14B only. OK to Perm when all trades Perm on remaining (3) units included on this permit. Note: Fire has approved for Perm. Occ on all four units.
|
FIRE-Final Inspection | 1/17/2009 | 1/20/2009 | 1/20/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 1/16/2009 | 1/16/2009 | 1/16/2009 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/16/2009 at 11:17:50 AM. Contact: ###-####. Need Fire Final OK
|
FIRE-Final Inspection | 1/14/2009 | 1/16/2009 | 1/16/2009 | A | PART |
Troy Cobbley
|
|
|
The addresses of 2842, 2844 and 2860 are ok to occupy. Address 2858 does not have the smoke alarms placed as per the plans. Basically two smoke alarms have not been placed immediately outside of the bedrooms but instead have been placed in the common areas near the peak. Plan review approval is required if they are to remain or they will need to be placed as per the plans.
|
BLD-Conference | 1/14/2009 | 1/14/2009 | 1/14/2009 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/14/2009 at 10:40:59 AM. Contact: ###-####. Need Fire, P/W and Electr finals.
|
BLD-Conference | 11/24/2008 | 11/24/2008 | 11/24/2008 | P | DONE |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/24/2008 at 8:04:06 AM. Contact: ###-####. Gave list of Req. for final.
|
BLD-Conference | 10/8/2008 | 10/9/2008 | 10/10/2008 | A | PEND |
Jim Sly
|
|
|
Level 3 Dev. working on finals for all permits on issued status.
|
BLD-Conference | 10/7/2008 | 10/7/2008 | 10/8/2008 | P | CANC |
Jim Sly
|
|
|
level 3 dev company Phone #: ###-####
|
BLD-Energy code compliance | 7/9/2007 | 7/10/2007 | 7/10/2007 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/9/2007 at 11:27:26 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/28/2007 | 6/29/2007 | 6/29/2007 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/28/2007 at 10:29:31 AM. Contact: ###-####.
|
BLD-Conference | 6/13/2007 | 6/13/2007 | 6/13/2007 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/13/2007 at 8:12:17 AM. Contact: ###-####. Shear wall OK
|
BLD-Conference | 6/1/2007 | 6/4/2007 | 6/4/2007 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/1/2007 at 4:55:12 PM. Contact: ###-####.
|
BLD-Other | 4/27/2007 | 4/27/2007 | 4/27/2007 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/27/2007 at 9:41:50 AM. Contact: ###-####.
|