Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-03138
StatusFinaled
Name JESSICA JANES
Site Address 2701 W HILLWAY DR
Project Name 
Customer Number 
ePlanReviewNo
Description
3/1/2007 THIS PROJECT IS MODIFIED TO REFLECT THE CONSTRUCTION OF A NEW FULLY ENGINEERED ACCESS/STAIR/BRIDGE STRUCTURE FROM THE UPPER DRIVEWAY LEVEL TO THE UPPER LEVEL OF THIS STRICTURE. THE ADDED VALUE TO THIS PROJECT IS $15,00. 3/1/2007. "RCE-1361 ANTON INVESTMENTS" This project is for the creation of usable space over an existing garage in the R-1B zoning area approved by Colleen Carroll. Separate electrical permit is required. All per the approved plans as marked and engineering attached. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/23/20089/25/20089/25/2008APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 9/23/2008 at 6:05:18 PM. Contact: ###-####.
DOC - Permit Finaled9/25/20089/25/20089/25/2008PPASS
DetailsTony Young
done
BLD-Conference9/18/20089/25/20089/25/2008ACANC
DetailsTony Young
jessica Phone #: ###-#### Disp set to [CANC] by a contractor via Hello! on Sep 25 2008 7:23AM.
BLD-Framing/Rough-in9/18/20079/19/20079/19/2007APASS
DetailsTony Young
jessica Phone #: ###-####
BLD-Framing/Rough-in9/14/20079/17/20079/17/2007AFAIL
DetailsJim Sly
jessica Note: ok to cover Phone #: ###-####
Too many issues with engineered systems.......Complete per approved plan and Engineering ....or.......Have Engineer review as built and provide "stamped" letter of approval. Leave all paperwork on site for next insp.
BLD - Request for Extension9/13/20079/14/20079/13/2007 PASS
DetailsTony Young
Jessica ###-####
BLD-Conference9/13/20079/13/20079/13/2007PPASS
DetailsTony Young
ok to keep active
BLD-Framing/Rough-in3/8/20073/8/20073/8/2007PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 3/8/2007 at 9:36:45 AM. Contact: ###-####.
will get letter ok ok on everything,, conf. on the job
BLD-Framing/Rough-in3/5/20073/6/20073/6/2007ANR
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/5/2007 at 4:15:03 PM. Contact: ###-####.
This is the 1st insp called in...........Eng shear panels, . Epoxy bolting, framing, siding, completed. No shear nailing insp completed. No approved plans on site. Need Engineering for shear........may have Engineer approve? Recall for insp with paperwork.