FIRE-Final Inspection | 9/27/2007 | 9/27/2007 | 9/27/2007 | | CANC |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 9/27/2007 | 9/27/2007 | 9/27/2007 | P | PASS |
Mike Jordan
|
|
|
Was looked at yesterday Phone #: ###-#### Internet Inspection Request from: Duane Seid. ok for perm occ.
|
BLD-Final | 9/4/2007 | 9/4/2007 | 9/4/2007 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Duane Seid
|
BLD-Final | 7/26/2007 | 7/26/2007 | 7/26/2007 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Duane Seidtemp ok
|
FIRE-Final Inspection | 7/26/2007 | 7/26/2007 | 7/26/2007 | P | PART |
Troy Cobbley
|
|
|
A temporay occupancy was given until the east elevator has been inspected and approved. Until then the east elevator is to remain locked out and is not to be used. The west elevator is approved for use. Also one additional emergency light is required in the exit lobby of the first floor south exit. Temporary signage in the stair towers has been provided until the permanant signs have been made. The non approved hardware on the second floor pocket door has been removed. The three fire hydrants have been tested for flow.
|
BLD-Other | 6/28/2007 | 6/28/2007 | 6/28/2007 | P | PASS |
Mike Jordan
|
|
|
dwayne - grid ceiling; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. grid ok.
|
BLD-Wall cover | 6/25/2007 | 6/25/2007 | 6/25/2007 | P | PART |
Jim Sly
|
|
|
Instpect ceiling grid and above ceiling rough-ins. Phone #: ###-#### Internet Inspection Request from: Duane Seid Select grid ceilings....2nd floor....OK. Entry...hard lid frame...OK
|
BLD-Wall cover | 5/30/2007 | 5/30/2007 | 5/30/2007 | A | PASS |
Mike Jordan
|
|
|
I am ready for cover in the remainder of the TI on the second floor. Phone #: ###-#### Internet Inspection Request from: Duane Seid. grid in ada restroom.
|
BLD-Energy code compliance | 5/21/2007 | 5/21/2007 | 5/21/2007 | P | PASS |
Mike Jordan
|
|
|
Perimeter walls are insulated and ready for inspection Phone #: ###-#### Internet Inspection Request from: Duane Seid. Should be shell and core energy.
|
BLD-Framing/Rough-in | 5/11/2007 | 5/11/2007 | 5/11/2007 | P | PASS |
Mike Jordan
|
|
|
I am ready for inspection for cover on the second floor tennant space. Phone #: ###-#### Internet Inspection Request from: Duane Seid Interior framing 2nd floor. pending plumbing.
|
BLD-Aging Inspection | 4/25/2007 | 4/25/2007 | 4/25/2007 | | PASS |
Mike Jordan
|
|
|
wip on shell and core.
|