Permit Information
Permit NumberBLD06-03276
StatusFinaled
Name INTERWEST HOMES
Site Address 2754 S GATEWOOD LN
Project Name 
Customer Number 
ePlanReviewNo
Description
"RCE-1127 INTERWEST HOMES INC" To construct a new 2514s.f. single family dwelling with 1749s.f. on the main level and 765s.f. on the upper level that uses bonus room type trusses over the 810s.f. 3-car garage. There is a basement storage room of 300s.f. that is to be separated from the dwelling unit as if it is exterior with insulation and exterior type door and insulation between this unconditioned area and the dwelling. If this area becoms conditioned or is used for other than storage "EGRESS" will be required from this area. R-1A ok per Sue Hansen. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City." All per the approved plans as marked Engineering for rear window wall and the plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/24/20074/25/20074/25/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/24/2007 at 9:56:44 AM. Contact: ###-####.
DOC - Permit Finaled4/25/20074/25/20074/25/2007PPASS
DetailsMike Jordan
Lot has been fine graded, handrail installed.
BLD-Final4/20/20074/20/20074/20/2007PFAIL
DetailsDave Hannah
ben; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt grade lot install handrail stairs to basement
BLD-Energy code compliance2/20/20072/21/20072/21/2007APASS
DetailsMike Jordan
ben; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok toi cover.
BLD-Energy code compliance2/16/20072/20/20072/20/2007AFAIL
DetailsMike Jordan
Ben; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Provide insulating foam at plumbing penetrations at tub and showers at main level floors. Provide insul at floor joist at cellar. Fireblock from cellar to crawl space transition.
BLD-Framing/Rough-in2/15/20072/16/20072/16/2007APASS
DetailsMike Jordan
ben; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. All framing issues have been resolved. wip on insul.
BLD-Framing/Rough-in2/12/20072/13/20072/13/2007PFAIL
DetailsMike Jordan
ben; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Provide header over doorway upstairs @ k1 truss. Provide approved repair for k3A truss were holes were drillled for plumbing. Winder treads for stairway to cellar are non conforming. Needs to have 6 inch min at any point and not vary more than 3/8 inch at 12 inch alk line. c/n posted. ok to insul.
BLD-Foundation1/8/20071/8/20071/8/2007PPASS
DetailsMike Jordan
BRIAN nOTE: WALL FOUNDATION; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing1/4/20071/5/20071/5/2007APART
DetailsMike Jordan
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Noted bottom of footing is frozen at about 1 inch down. Contractor to thaw or wait till weather warms up.
BLD-Foundation12/28/200612/29/200612/29/2006PPASS
DetailsMike Jordan
bryan - wall; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Basement wall. Also spoke to contractor regarding backfill around basement wall. Will need to provide compaction testing or backfill with drain rock.
BLD-Footing12/21/200612/21/200612/21/2006PPART
DetailsMike Jordan
brian ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Footing for basement wall.