BLD-Final | 4/24/2007 | 4/25/2007 | 4/25/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/24/2007 at 9:56:44 AM. Contact: ###-####.
|
DOC - Permit Finaled | 4/25/2007 | 4/25/2007 | 4/25/2007 | P | PASS |
Mike Jordan
|
|
|
Lot has been fine graded, handrail installed.
|
BLD-Final | 4/20/2007 | 4/20/2007 | 4/20/2007 | P | FAIL |
Dave Hannah
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt grade lot install handrail stairs to basement
|
BLD-Energy code compliance | 2/20/2007 | 2/21/2007 | 2/21/2007 | A | PASS |
Mike Jordan
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok toi cover.
|
BLD-Energy code compliance | 2/16/2007 | 2/20/2007 | 2/20/2007 | A | FAIL |
Mike Jordan
|
|
|
Ben; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Provide insulating foam at plumbing penetrations at tub and showers at main level floors. Provide insul at floor joist at cellar. Fireblock from cellar to crawl space transition.
|
BLD-Framing/Rough-in | 2/15/2007 | 2/16/2007 | 2/16/2007 | A | PASS |
Mike Jordan
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. All framing issues have been resolved. wip on insul.
|
BLD-Framing/Rough-in | 2/12/2007 | 2/13/2007 | 2/13/2007 | P | FAIL |
Mike Jordan
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Provide header over doorway upstairs @ k1 truss. Provide approved repair for k3A truss were holes were drillled for plumbing. Winder treads for stairway to cellar are non conforming. Needs to have 6 inch min at any point and not vary more than 3/8 inch at 12 inch alk line. c/n posted. ok to insul.
|
BLD-Foundation | 1/8/2007 | 1/8/2007 | 1/8/2007 | P | PASS |
Mike Jordan
|
|
|
BRIAN nOTE: WALL FOUNDATION; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 1/4/2007 | 1/5/2007 | 1/5/2007 | A | PART |
Mike Jordan
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Noted bottom of footing is frozen at about 1 inch down. Contractor to thaw or wait till weather warms up.
|
BLD-Foundation | 12/28/2006 | 12/29/2006 | 12/29/2006 | P | PASS |
Mike Jordan
|
|
|
bryan - wall; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Basement wall. Also spoke to contractor regarding backfill around basement wall. Will need to provide compaction testing or backfill with drain rock.
|
BLD-Footing | 12/21/2006 | 12/21/2006 | 12/21/2006 | P | PART |
Mike Jordan
|
|
|
brian ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Footing for basement wall.
|