BLD-Final | 8/13/2008 | 8/13/2008 | 8/13/2008 | P | PASS |
Jim Sly
|
|
|
David Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 7/25/2008 | 7/25/2008 | 7/25/2008 | A | PART |
Jim Sly
|
|
|
OK for Temp Occ. Need Letter from special insp agency and Engineer of record.
|
BLD-Final | 7/21/2008 | 7/21/2008 | 7/14/2008 | A | DONE |
Lori Flook
|
|
|
inspected per SLandaluce 7/14/08.
|
BLD-Framing/Rough-in | 7/9/2008 | 7/10/2008 | 7/10/2008 | P | DONE |
Jim Sly
|
|
|
David Phone #: ###-####
|
Code Occupancy Approval | 7/9/2008 | 7/9/2008 | 7/9/2008 | P | PASS |
Carol Montgomery
|
|
|
Insp. @ 2:00-2:15; Phone #: ###-####
Meets compliance with CUP. Signed Occupancy card FINAL
|
FIRE-Final Inspection | 7/3/2008 | 7/7/2008 | 7/7/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety completed per notes of last inspection.KR
|
FIRE-Final Inspection | 6/26/2008 | 6/27/2008 | 6/27/2008 | A | FAIL |
Forrest France
|
|
|
All testing completed. Could not pass until kitchen hood system permit is finaled. KR
|
BLD-Final | 4/10/2008 | 4/11/2008 | 4/11/2008 | A | NR |
Jim Sly
|
|
|
Reviewed Requirements to obtain final.
|
BLD-Other | 3/27/2008 | 3/27/2008 | 3/27/2008 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/27/2008 at 9:09:08 AM. OK'd 1hr Celing in Mechanical room.....in leiu of walls continuing up to roof deck. Rm at North side of bldg
|
BLD-Conference | 3/20/2008 | 3/21/2008 | 3/21/2008 | P | NR |
Jim Sly
|
|
|
Ceiling grid.....Need Fire approval Need 1 slack wire on all appliances...ie HVAC diffusers.
|
BLD-Other | 3/20/2008 | 3/20/2008 | 3/20/2008 | P | CANC |
Jim Sly
|
|
|
nacho - ceiling grid Phone #: ###-#### Need fire sprinkler approval
|
BLD-Conference | 3/19/2008 | 3/19/2008 | 3/19/2008 | P | DONE |
Jim Sly
|
|
|
Nacho Phone #: ###-#### Walk thru with Nacho.......checked wood trusses.....OK Metal Trusses in Gym questioned ........Capable of carrying extra load from basketball standards....OK'd. Looked at insulation and scrim covering....will come back later to take a better look.
|
BLD-Conference | 2/14/2008 | 2/14/2008 | 2/14/2008 | P | DONE |
Troy Cobbley
|
|
|
I did a quick walk through while waiting for the sprinkler underground flush and found the t-bar is being installed as well as some ceiling tiles/lights. I notified the project superintendant that no ceiling are to be installed or sprinkler piping to be covered since the sprinkler system has not been inspected yet. Jim Sly the structural inspector has also been notified.
|
BLD-Framing/Rough-in | 12/3/2007 | 12/4/2007 | 12/4/2007 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/3/2007 at 3:23:59 PM. Contact: ###-####. interior classroom walls...... and select walls ok.
|
BLD-Framing/Rough-in | 10/22/2007 | 10/23/2007 | 10/23/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/22/2007 at 5:14:34 PM. Contact: ###-####. Nailing for roof diaphragm, low roofs only.
|
BLD-Foundation | 6/26/2007 | 6/26/2007 | 6/26/2007 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/26/2007 at 7:30:13 AM. Contact: ###-####. OK pending STRATA SPECIAL INSP, TESTS and approvals
|
BLD-Foundation | 6/22/2007 | 6/22/2007 | 6/22/2007 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/22/2007 at 7:28:45 AM. In/terior footings............STRATA
|
BLD-Foundation | 6/18/2007 | 6/20/2007 | 6/20/2007 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/18/2007 at 11:33:50 AM. Contact: ###-####. Interior footings...........OK pending STRATA insp, tests, and approvals.
|
BLD-Foundation | 5/31/2007 | 6/1/2007 | 6/1/2007 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/31/2007 at 12:26:41 PM. Contact: ###-####. OK pend STRATA insp and appr.
|
BLD-Foundation | 5/29/2007 | 5/30/2007 | 5/30/2007 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/29/2007 at 12:54:18 PM. OK pend STRATA insp and appr.
|
BLD-Foundation | 5/17/2007 | 5/21/2007 | 5/21/2007 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/17/2007 at 1:35:44 PM. Contact: ###-####. OK pending STRATA insp, tests, and approvals
|
BLD-Foundation | 5/15/2007 | 5/18/2007 | 5/18/2007 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/15/2007 at 1:06:41 PM. Contact: ###-####. Footings at South East area....section C OK pending STRATA special insp, tests, and approvals.
|
BLD-Foundation | 5/15/2007 | 5/17/2007 | 5/17/2007 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/15/2007 at 1:05:56 PM. Contact: ###-####. ok pending S. I. report
|
BLD-Foundation | 5/15/2007 | 5/16/2007 | 5/16/2007 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/15/2007 at 1:05:14 PM. Contact: ###-####. Footings ... South wall OK pending STRATA special inspection, tests, and approvals.
|