BLD-Final | 1/7/2008 | 1/7/2008 | 1/7/2008 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
DOC - Permit Finaled | 1/7/2008 | 1/7/2008 | 1/7/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 12/21/2007 | 12/24/2007 | 12/24/2007 | A | NR |
Tom Arcoraci
|
|
|
bob Phone #: ###-####
|
BLD-Energy code compliance | 7/6/2007 | 7/9/2007 | 7/9/2007 | A | PASS |
Jim Storey
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
BLD-Framing/Rough-in | 7/3/2007 | 7/5/2007 | 7/5/2007 | A | PASS |
Jim Storey
|
|
|
BOB Phone #: ###-####c/nmade ok
|
BLD-Framing/Rough-in | 6/29/2007 | 7/3/2007 | 7/3/2007 | A | FAIL |
Mike Jordan
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. Provide min 3 nails for attachment of jack trusses. Fireblock fireplace flue at ceiling level. Draft stop open floor trusses so as not to exceed 1000sqft. G1 and G2 trusses require scab brace as noted on truss engineering. Provide additional studs under bearing points on F1 and F3 floor trusses. More nails on G2 top chord. Justify deletion of 2x6 bearing condition as noted on truss engineering? ok to insul. c/n posted.
|
BLD-Foundation | 3/8/2007 | 3/9/2007 | 3/9/2007 | A | PASS |
Jim Storey
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Footing | 3/6/2007 | 3/7/2007 | 3/7/2007 | A | PASS |
Jim Storey
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|