BLD-Final | 6/26/2007 | 6/27/2007 | 6/27/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/26/2007 at 3:15:50 PM. Contact: ###-####. ok for perm occ
|
FIRE-Final Inspection | 6/26/2007 | 6/27/2007 | 6/27/2007 | A | PASS |
Forrest France
|
|
|
Building final fire life safety inspection passed.
|
Permanent Occupancy | | 6/27/2007 | 6/27/2007 | | DONE |
|
|
|
|
BLD-Final | 6/25/2007 | 6/26/2007 | 6/26/2007 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/25/2007 at 3:33:51 PM. Contact: ###-####.
|
FIRE-Final Inspection | 6/26/2007 | 6/26/2007 | 6/26/2007 | P | NR |
Forrest France
|
|
|
Building life safety final pending project related fire sprinkler permit final, one emergency light has been repaired.
|
BLD-Final | 6/22/2007 | 6/25/2007 | 6/26/2007 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/22/2007 at 2:07:19 PM. Contact: ###-####.
|
FIRE-Final Inspection | 6/22/2007 | 6/25/2007 | 6/25/2007 | A | FAIL |
Forrest France
|
|
|
Need to repair one emergency light at the waiting area, one fire sprinkler head in a storage closet is cut in too high, need to have the project related fire alarm and fire sprinkler permits called in for final prior to life safety sign off, also need to post suite address numbers.
|
BLD-Other | 6/9/2007 | 6/11/2007 | 6/14/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/9/2007 at 11:39:02 AM. Contact: ###-####. ceiling grid need to finsih wireing lights and need to check door way framing
|
BLD-Energy code compliance | 4/18/2007 | 4/18/2007 | 4/18/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/18/2007 at 9:27:05 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/13/2007 | 4/16/2007 | 4/17/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/13/2007 at 12:58:50 PM. Contact: ###-####.
|