BLD-Final | 1/3/2008 | 1/4/2008 | 1/4/2008 | A | PASS |
Tom Arcoraci
|
|
|
rick - please call 1/2 hr prior to inspection Phone #: ###-#### ok for perm
|
BLD-Final | 11/29/2007 | 11/30/2007 | 12/3/2007 | P | PART |
Dave Hannah
|
|
|
rick Phone #: ###-#### Note: please call 1/2 hr prior to inspection ok for temp occ needs plumbing to go perm needs ada stoves in a units and fix water closit
|
FIRE-Final Inspection | 11/29/2007 | 11/30/2007 | 11/30/2007 | A | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
FIRE-Final Inspection | 11/27/2007 | 11/28/2007 | 11/28/2007 | A | FAIL |
Troy Cobbley
|
|
|
The project related fire sprinkler permit needs finaled first. I went over the life safety requirements with Rick.
|
Code Occupancy Approval | 11/28/2007 | 11/28/2007 | 11/28/2007 | P | PASS |
Dena Gambrel
|
|
|
|
Code Occupancy Approval | 11/21/2007 | 11/21/2007 | 11/21/2007 | P | FAIL |
Dena Gambrel
|
|
|
11-21-07 Need striping and wheel stops installed.
|
BLD-Energy code compliance | 9/20/2007 | 9/21/2007 | 9/21/2007 | P | PASS |
Tom Arcoraci
|
|
|
RICK Phone #: ###-####
|
BLD-Conference | 9/18/2007 | 9/18/2007 | 9/18/2007 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 9/17/2007 | 9/18/2007 | 9/18/2007 | P | CANC |
Tom Arcoraci
|
|
|
rick Phone #: ###-####
|
BLD-Framing/Rough-in | 9/17/2007 | 9/18/2007 | 9/18/2007 | P | PASS |
Tom Arcoraci
|
|
|
rick Phone #: ###-####
|
BLD-Framing/Rough-in | 8/15/2007 | 8/16/2007 | 8/16/2007 | A | PART |
Tom Arcoraci
|
|
|
RICK NOTE: PARTIAL Phone #: ###-####
|
BLD-Other | 8/9/2007 | 8/10/2007 | 8/10/2007 | A | PASS |
Jim Sly
|
|
|
rick Note: shear Phone #: ###-#### Ext shear nailing, flr/flr straps OK. holdowns....including ones for 4x4's at cantilever in breezeway ....inspected by MTI.
|
BLD-Conference | 6/27/2007 | 6/27/2007 | 6/27/2007 | P | PASS |
Tom Arcoraci
|
|
|
rick Phone #: ###-####
|
BLD-Foundation | 6/15/2007 | 6/18/2007 | 6/18/2007 | A | PASS |
Tom Arcoraci
|
|
|
RICK; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles mti on site
|
BLD-Footing | 6/14/2007 | 6/15/2007 | 6/15/2007 | A | PASS |
Mike Jordan
|
|
|
rick ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. footings for breezeway and alt for additional bedroom. breezeway will be enclosed. Reviewed special insp. reports for soils issues and RFI from engineer. ok.
|
BLD-Footing | 6/4/2007 | 6/5/2007 | 6/5/2007 | A | CANC |
Tom Arcoraci
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Conference | 6/5/2007 | 6/5/2007 | 6/5/2007 | P | PASS |
Tom Arcoraci
|
|
|
rick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|