BLD-Final | 4/30/2010 | 5/3/2010 | 5/6/2010 | A | PASS |
Dave Hannah
|
|
|
Status update please for Barb please? Phone #: ###-####
|
FIRE-Final Inspection | 3/25/2010 | 3/25/2010 | 3/25/2010 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 3/24/2010 | 3/24/2010 | 3/24/2010 | P | PASS |
Forrest France
|
|
|
Noted corrections are finished per activity notes on project related FIR and BLD permits.
|
BLD-Final | 5/4/2009 | 5/5/2009 | 5/6/2009 | P | NR |
Dave Hannah
|
|
|
marva Phone #: ###-####
|
FIRE-Final Inspection | 5/4/2009 | 5/5/2009 | 5/5/2009 | P | FAIL |
Forrest France
|
|
|
See correction notice items for shell permit BLD06-00845.
|
FIRE-Conference | 1/14/2009 | 1/14/2009 | 1/14/2009 | P | DONE |
Forrest France
|
|
|
Regarding project related fire sprinkler permit work finals.
|
FIRE-Final Inspection | 8/11/2008 | 8/12/2008 | 8/18/2008 | A | FAIL |
Forrest France
|
|
|
Failed per inspection comments 7/6/07.
|
BLD-Final | 8/11/2008 | 8/12/2008 | 8/14/2008 | A | PART |
Dave Hannah
|
|
|
Barb----Forrest/Dave this was given temp on 7-6-07 and I need to know if they did what was required to give them perm? See activity notes regarding inspection on 7-6-07. Please let me know...thanks Phone #: ###-####
|
DOC - Permit Expired | | | 7/9/2008 | | |
Tisha Gallop
|
|
|
Spoke with Tammy from McAlvain Construction; they are no longer doing this project and do not plan on continuing with this project. No other contractor has taken over. The project has stopped for financial reasons and there has been no activity out there past the expiration date. There cannot be a perm. occupancy issued because the shell permit Bld06-00845 has also expired and stopped work.//7/8/08 LEG
|
BLD-Final | 7/5/2007 | 7/6/2007 | 7/6/2007 | A | PART |
Jim Storey
|
|
|
Dennis ; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok per 425
|
FIRE-Final Inspection | 7/5/2007 | 7/6/2007 | 7/6/2007 | A | FAIL |
Troy Cobbley
|
|
|
This inspection was for the tenant only. The fire alarm and fire sprinkler permits need finaling. Also the doors and hardware need to be installed for verification and the plans indicate the second exit out of the south side of the building through an egress corridor. The exit sign does not point the way and there has been a barrier installed. Per the contractor there is documentation coming that will allow the second exit through the back (west end) of the tenant.
|
BLD-Final | 7/2/2007 | 7/3/2007 | 7/3/2007 | P | NR |
Dave Hannah
|
|
|
###-#### Dennis Coleman- Temp only please needs other trades to signoff
|
FIRE-Final Inspection | 7/2/2007 | 7/3/2007 | 7/3/2007 | A | NR |
Forrest France
|
|
|
Pending shell related permit finals.
|
BLD-Final | 7/1/2007 | 7/2/2007 | 7/2/2007 | P | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Alex Monge
|
BLD-Framing/Rough-in | 6/18/2007 | 6/19/2007 | 6/19/2007 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Alex Monge
|