FIRE-Final Inspection | 4/15/2009 | 4/16/2009 | 4/16/2009 | A | PASS |
Forrest France
|
|
|
Project related fire permits finaled, fire life safety approved for final.
|
FIRE-Conference | 4/15/2009 | 4/15/2009 | 4/15/2009 | P | DONE |
Forrest France
|
|
|
Regarding items needed for permit final.
|
BLD-Final | 4/14/2009 | 4/14/2009 | 4/14/2009 | P | PASS |
Tom Arcoraci
|
|
|
bryan Phone #: ###-#### ok for perm
|
BLD-Conference | 3/25/2009 | 3/25/2009 | 3/25/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 3/25/2009 | 3/25/2009 | 3/25/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 1/23/2009 | 1/23/2009 | 1/23/2009 | P | CANC |
Tom Arcoraci
|
|
|
brian Phone #: ###-####
|
BLD-Conference | 12/23/2008 | 12/23/2008 | 12/23/2008 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Conference | 10/29/2008 | 10/29/2008 | 10/29/2008 | P | DONE |
Dave Hannah
|
|
|
brian Phone #: ###-#### can not remove fire proofing from columns
|
BLD-Final | 10/14/2008 | 10/15/2008 | 10/15/2008 | P | PART |
Dave Hannah
|
|
|
brian Phone #: ###-#### ok for temp occ on rest of school after all ext work is completed ok for perm occ
|
FIRE-Final Inspection | 10/14/2008 | 10/15/2008 | 10/14/2008 | A | PART |
Forrest France
|
|
|
All corrections made per last inspection. Could not final until fire alarm permit is finaled. KR
|
FIRE-Final Inspection | 10/10/2008 | 10/13/2008 | 10/13/2008 | A | FAIL |
Forrest France
|
|
|
Project related fire alarm permit needs to pass final inspection prior to building life safety approval. Also noted 2 EM lights and one exit sign in need of repair, provide one fire extinguisher for the 2nd level prop storage area, missing drop ceilings at three vestibules, one missing sprinkler escutcheon at the south hall, noted two exit signs at the stage area above doors with locking hardware at the egress side.
|
BLD-Final | 10/10/2008 | 10/13/2008 | 10/13/2008 | P | NR |
Dave Hannah
|
|
|
brian Phone #: ###-#### needs fire finals first
|
DOC - Permit Finaled | 10/13/2008 | 10/13/2008 | 10/13/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/20/2008 | 8/20/2008 | 8/20/2008 | P | PART |
Jim Storey
|
|
|
greg Note: Phone #: ###-#### Please call to meet with fire guy forrest for inspection temp ok with fire dept agreements by d henaman for occ of all but adatorermam. si final report pending 1 idem from engineer of record.
|
FIRE-Final Inspection | 8/15/2008 | 8/15/2008 | 8/15/2008 | P | PART |
Forrest France
|
|
|
See notice of violation for corrections made. KR
|
BLD-Final | 8/11/2008 | 8/11/2008 | 8/13/2008 | P | PART |
Dave Hannah
|
|
|
brian Phone #: ###-#### ok to use to west side of bldg fire has oking fire watch exiting is all in place
|
FIRE-Final Inspection | 8/11/2008 | 8/11/2008 | 8/12/2008 | P | PART |
Forrest France
|
|
|
Tested remainder of EM lighting and exit signs-noted two exit signs and two EM lights to be repaired, also noted exit discharge lights at three locations are not functional at areas E,F,&B. See 12 item correction notice left on site for a list of life safety issues to be completed prior to final occupancy approval. Also issued correction notices for fire alarm and sprinkler permits including 8 items for FA and 3 items for FS. Per agreement with the contractor and Deputy Chief D. Hanneman school registration may take place provided the fire watch for area "A" auditorium is maintained and limited access to the remainder of the building is provided.
|
BLD-Final | 8/8/2008 | 8/11/2008 | 8/11/2008 | A | PART |
Dave Hannah
|
|
|
brian Phone #: ###-#### stell need fires ok talked with tom A about project he has done several walks with brian most everything is in good shape
|
FIRE-Final Inspection | 8/7/2008 | 8/8/2008 | 8/8/2008 | P | NR |
Forrest France
|
|
|
Project is not in condition for final life safety at this time due to construction/finish work in progress, area A is not complete, both elevators are not functional, kitchen hood is not ready for final inspection and testing, site work still underway, noted temporary address and max occupant load signs, tested exit signs and EM lights for areas B, C, and D first floor-noted five exit signs in need of repair. Hydrants, fire extinguishers, and door hardware appear acceptable for areas inspected to date. Discussed project schedule.
|
Code Occupancy Approval Temp | 8/6/2008 | 8/6/2008 | 8/6/2008 | P | PASS |
Dena Gambrel
|
|
|
8-6-08 TEMPORARY OCCUPANCY ONLY. Bond was received for the parking lot and remaining landscaping.
|
Code Occupancy Approval Temp | 8/4/2008 | 8/4/2008 | 8/4/2008 | P | FAIL |
Dena Gambrel
|
|
|
8-1-08 Failed. Need to post bond for remaining landscaping in phase 1 and then bond for the parking lot and landscaping for phase 2. Correction notice issued.
|
BLD-Final | 7/31/2008 | 8/1/2008 | 8/1/2008 | P | PART |
Tom Arcoraci
|
|
|
ok for staff to fit up class rooms admin cafe and gym pending ok from fire dept
|
BLD-Final | 7/31/2008 | 8/1/2008 | 8/1/2008 | A | PART |
Tom Arcoraci
|
|
|
looked at half of building minor discrepancy
|
BLD-Final | 7/31/2008 | 7/31/2008 | 7/31/2008 | P | NR |
Tom Arcoraci
|
|
|
Brian Phone #: ###-#### discussed final insp issues
|
BLD-Wall cover | 7/16/2008 | 7/17/2008 | 7/17/2008 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/16/2008 at 4:34:50 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/19/2008 | 6/19/2008 | 6/19/2008 | P | PART |
Tony Young
|
|
|
bryan - ceiling cover Phone #: ###-#### classroom coridoors 1st and 2nd floor ok area H and D,, also music room ok
|
BLD-Other | 5/21/2008 | 5/22/2008 | 5/22/2008 | A | PASS |
Tom Arcoraci
|
|
|
brian Note: overhead for cover Phone #: ###-#### grid ok wip
|
BLD-Framing/Rough-in | 5/7/2008 | 5/8/2008 | 5/8/2008 | A | PART |
Tom Arcoraci
|
|
|
byran - overhead to cover Phone #: ###-#### wip ok
|
BLD-Framing/Rough-in | 2/15/2008 | 2/19/2008 | 2/19/2008 | A | PART |
Tom Arcoraci
|
|
|
byran Phone #: ###-#### wip ok
|
BLD-Framing/Rough-in | 1/28/2008 | 1/28/2008 | 1/28/2008 | P | PART |
Tom Arcoraci
|
|
|
bryan Phone #: ###-#### wip ok
|
BLD-Aging Inspection | 1/16/2008 | 1/16/2008 | 1/16/2008 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/15/2007 | 11/15/2007 | 11/15/2007 | | PASS |
Tom Arcoraci
|
|
|
wip ok spec insp on site
|
BLD-Foundation | 9/12/2007 | 9/13/2007 | 9/13/2007 | A | PASS |
Tom Arcoraci
|
|
|
bryan Phone #: ###-####
|
DOC - Permit Finaled | 9/13/2007 | 9/13/2007 | 9/13/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 9/6/2007 | 9/6/2007 | 9/7/2007 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 9/5/2007 | 9/6/2007 | 9/6/2007 | A | PASS |
Tom Arcoraci
|
|
|
Brian; Phone #: ###-#### Internet Inspection Request from: Hattie James
|
BLD-Foundation | 8/27/2007 | 8/28/2007 | 8/28/2007 | A | PART |
Tom Arcoraci
|
|
|
bryan Phone #: ###-####
|
BLD-Other | 8/15/2007 | 8/16/2007 | 8/16/2007 | A | PASS |
Tom Arcoraci
|
|
|
bryan Note: concrete slap wire mess Phone #: ###-####
|
BLD-Footing | 8/10/2007 | 8/13/2007 | 8/13/2007 | A | PART |
Mike Jordan
|
|
|
brian Phone #: ###-####. Special insp.
|
BLD-Foundation | 8/3/2007 | 8/6/2007 | 8/6/2007 | A | PART |
Tom Arcoraci
|
|
|
Ryan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Other | 8/1/2007 | 8/2/2007 | 8/2/2007 | P | PASS |
Tom Arcoraci
|
|
|
bryan Note: wire mess reinforcement for slap Phone #: ###-#### specc insp
|
BLD-Footing | 7/30/2007 | 7/31/2007 | 7/31/2007 | A | PART |
Tom Arcoraci
|
|
|
bryan Phone #: ###-#### spec insp
|
BLD-Foundation | 7/23/2007 | 7/24/2007 | 7/24/2007 | A | PASS |
Tom Arcoraci
|
|
|
bryan Phone #: ###-####
|
BLD-Foundation | 7/17/2007 | 7/18/2007 | 7/19/2007 | A | PART |
Tom Arcoraci
|
|
|
brian Phone #: ###-####
|
BLD-Footing | 7/10/2007 | 7/11/2007 | 7/11/2007 | A | PART |
Tom Arcoraci
|
|
|
brian Phone #: ###-####
|
BLD-Footing | 7/2/2007 | 7/3/2007 | 7/3/2007 | A | PASS |
Tom Arcoraci
|
|
|
brian - re-bar Phone #: ###-####
|
BLD-Footing | 6/26/2007 | 6/27/2007 | 6/28/2007 | P | PART |
Tom Arcoraci
|
|
|
brian Note: rebar Phone #: ###-####
|